BLD-Footing | 7/14/2020 | 7/15/2020 | 7/15/2020 | A | PART |
Tell Riley
|
|
|
call for access- Larry *screened* Phone #: ###-####//footings ok per engineers RFI due to site condtions//front porch footings appear to meet 24" frost depth and have a footing under the stoop//maintain clearances on rebar prior to pour//
|
Issue PAID IN FULL permit | | | 6/3/2020 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 6/3/2020 | | DONE |
|
|
|
|
Plan assigned to (JAB) Josh | 3/13/2020 | 3/13/2020 | 6/2/2020 | | PASS |
Josh Bogle
|
|
|
03/19 remodel, ePlan - 1st done
|
Routing - PLAN CHECK | 6/2/2020 | | 6/2/2020 | | PASS |
Josh Bogle
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 6/2/2020 | | DONE |
Josh Bogle
|
|
|
ESC no - Energy yes
|
Permit Ready to Issue | | | 6/2/2020 | | DONE |
|
|
|
|
Routing - PLANNING | 6/1/2020 | | 6/1/2020 | | PASS |
Sue Cummings
|
|
|
|
Routing - PLAN CHECK | 4/6/2020 | | 4/13/2020 | | FAIL |
Josh Bogle
|
|
|
see notes in ePlan
|
Plan Modification Accepted | | | 4/6/2020 | | DONE |
Josh Bogle
|
|
|
|
Routing - PLANNING | 4/6/2020 | | 4/6/2020 | | FAIL |
Sue Cummings
|
|
|
site plan and floor plan don't match
|
1st review completed | | | 3/20/2020 | | FAIL |
Josh Bogle
|
|
|
|
Routing - PLAN CHECK | 3/13/2020 | | 3/20/2020 | | FAIL |
Josh Bogle
|
|
|
plans incomplete
|
Routing - MECHANICAL | 3/19/2020 | | 3/20/2020 | | PASS |
Troy James
|
|
|
|
Plan Reviewer's activity | | | 3/19/2020 | | DONE |
Josh Bogle
|
|
|
added routing that was missed at pre-screen
|
Routing - PLANNING | 3/13/2020 | | 3/16/2020 | | FAIL |
Sue Cummings
|
|
|
The drawings do not match
|
Application received | | | 3/13/2020 | | DONE |
|
|
|
Application submitted via PDS Online on Mar 13 2020 1:40PM
|
Plans ACCEPTED BY PLAN TECH | | | 3/13/2020 | | DONE |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 3/13/2020 | | DONE |
|
|
|
|
Intake Approval | | | 3/13/2020 | | PASS |
|
|
|
|