BLD-Framing/Rough-in | 7/6/2020 | 7/7/2020 | 7/7/2020 | A | PASS |
Brandon Shaw
|
|
|
Corrections SAT... Framing rough-in and energy, OK to cover...
|
BLD-Framing/Rough-in | 6/30/2020 | 7/2/2020 | 7/2/2020 | P | FAIL |
Brandon Shaw
|
|
|
See MEC20-02086 corrections not complete...
|
BLD-Framing/Rough-in | 6/22/2020 | 6/23/2020 | 6/23/2020 | A | FAIL |
Brandon Shaw
|
|
|
Provide truss layout and Engineering packet... Point loads to bear down to foundation, garage and front bedrooms, See red marks... Complete Mec corrections...
|
Routing Walk-In (Zoning) | 3/16/2020 | 3/16/2020 | 3/16/2020 | A | PASS |
Jeff Lowe
|
|
|
|
Routing Walk-In (BLD) | 3/16/2020 | 3/16/2020 | 3/16/2020 | A | DONE |
Josh Bogle
|
|
|
|
Routing - PLAN CHECK | 3/16/2020 | | 3/16/2020 | | PASS |
Josh Bogle
|
|
|
|
1st review completed | | | 3/16/2020 | | DONE |
Josh Bogle
|
|
|
|
Inspection Record Card- Bld | | | 3/16/2020 | | DONE |
Josh Bogle
|
|
|
|
Case Summary (BLD) | | | 3/16/2020 | | DONE |
Josh Bogle
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 3/16/2020 | | DONE |
Josh Bogle
|
|
|
ESC no - Energy yes
|
Permit Ready to Issue | | | 3/16/2020 | | DONE |
|
|
|
MET
|
Issue PAID IN FULL permit | | | 3/16/2020 | | DONE |
|
|
|
|
Application received | | 3/16/2020 | | | |
|
|
|
|