BLD-Framing/Rough-in | 7/6/2020 | 7/7/2020 | 7/7/2020 | A | PASS |
Jim Storey
|
|
|
Steve SCREENED Phone #: ###-####
|
DOC - Permit Finaled | 7/7/2020 | 7/7/2020 | 7/7/2020 | P | PASS |
Jim Storey
|
|
|
|
BLD-Final | 7/7/2020 | 7/7/2020 | 7/7/2020 | A | PASS |
Jim Storey
|
|
|
Steve SCREENED Phone #: ###-####
|
BLD-Footing | 6/18/2020 | 6/19/2020 | 6/19/2020 | A | PASS |
Brandon Shaw
|
|
|
SCREEND// Steve Phone #: ###-####
|
Plan assigned to (JAB) Josh | 5/12/2020 | 5/12/2020 | 6/4/2020 | | PASS |
Josh Bogle
|
|
|
05/18 patio cover, ePlan - 1st done
|
Routing - PLAN CHECK | 6/4/2020 | | 6/4/2020 | | PASS |
Josh Bogle
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 6/4/2020 | | DONE |
Josh Bogle
|
|
|
ESC no - Energy no
|
Permit Ready to Issue | | | 6/4/2020 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 6/4/2020 | | DONE |
|
|
|
|
1st review completed | | | 5/15/2020 | | FAIL |
Josh Bogle
|
|
|
|
Plan Reviewer's activity | | | 5/15/2020 | | DONE |
Josh Bogle
|
|
|
accepted and routed resubmittal
|
Routing - PLANNING | 5/15/2020 | | 5/15/2020 | | PASS |
KayCee Babb
|
|
|
|
Routing - PLAN CHECK | 5/12/2020 | | 5/15/2020 | | FAIL |
Josh Bogle
|
|
|
no review pending Planning approval
|
Routing - PLANNING | 5/13/2020 | | 5/13/2020 | | FAIL |
KayCee Babb
|
|
|
Plans do not match prior Design Review approval, with patio cover now encroaching into the 5-foot side setback.
|
Plans ACCEPTED BY PLAN TECH | | | 5/12/2020 | | DONE |
|
|
|
|
Intake Approval | | | 5/12/2020 | | PASS |
|
|
|
|
Routing Walk-In (Zoning) | 3/16/2020 | 3/16/2020 | 3/16/2020 | P | PASS |
Ethan Mansfield
|
|
|
|
Routing Walk-In (BLD) | 3/16/2020 | 3/16/2020 | 3/16/2020 | P | FAIL |
Josh Bogle
|
|
|
|
Routing - PLAN CHECK | 3/16/2020 | | 3/16/2020 | | FAIL |
Josh Bogle
|
|
|
lacked build details and engineering
|
1st review completed | | | 3/16/2020 | | FAIL |
Josh Bogle
|
|
|
|
Application received | | 3/16/2020 | | | |
|
|
|
|