Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberBLD20-00933
StatusIssued
Name TIMMONS CONSTRUCTION INC
Site Address 6000 W CHESTNUT DR
Project NameSkylar & Kim Simmons Addition
Customer Number 
ePlanReviewYes
Description
Permit for a 280sq' addition that adds a closet and full bath to create a Master Suite. Heating/cooling of addition by extending runs from the existing system - Energy Code via Prescriptive. All work per plans, notations, local codes & ordinances. Separate electrical, plumbing & mechanical permits required. **JAB**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Energy code compliance5/22/20205/26/20205/26/2020PPASS
DetailsTell Riley
Jason Phone #: ###-####//shear corrections were made and photos sent//insulation ok whne completed//window next to door needs to have both panes safety glazed prior to final//
BLD-Framing/Rough-in5/21/20205/22/20205/22/2020PPASS
DetailsTell Riley
Screened- Jason Phone #: ###-####//ok to insulate//
BLD-Wall Bracing5/12/20205/13/20205/13/2020ANH
DetailsTell Riley
virtual inspection requested // Jason Phone #: ###-####//left VM, exterior shear, should be able to perform onsite inspeciton//no one onsite, no answer on phone, will need to reshedule when someone is onsite or I have access to back//
BLD-Footing3/31/20204/1/20204/1/2020PPART
DetailsTell Riley
Phone #: ###-#### Inspection requested via web by Jason Timmons//setbacks inline with site plan and zoning document--same plane as exisitng house//WIP on walls and footings//
BLD-Footing3/30/20203/31/20203/31/2020PCANC
DetailsTell Riley
Would like to inspect between 1 and 2 pm. Thanks Phone #: ###-#### >> Inspection requested via web by Jason Timmons Inspection cancelled from web by: Jason Timmons
OVERRIDE  3/16/2020  
Application received  3/16/2020 DONE
Application submitted via PDS Online on Mar 16 2020 1:48PM
Routing Walk-In (Zoning)3/16/20203/16/20203/16/2020PPASS
DetailsCrystal Rain
Routing Walk-In (BLD)3/16/20203/16/20203/16/2020PDONE
DetailsJosh Bogle
Routing - PLAN CHECK3/16/2020 3/16/2020 PASS
DetailsJosh Bogle
1st review completed  3/16/2020 DONE
DetailsJosh Bogle
Inspection Record Card- Bld  3/16/2020 DONE
DetailsJosh Bogle
Case Summary (BLD)  3/16/2020 DONE
DetailsJosh Bogle
PLANS/APPL TAKEN TO FRONT DESK  3/16/2020 DONE
DetailsJosh Bogle
ESC yes - Energy yes
Permit Ready to Issue  3/16/2020 DONE
NEED
RP
Issue PAID IN FULL permit  3/16/2020 DONE