BLD-Concrete | 8/5/2020 | 8/6/2020 | 8/6/2020 | P | CANC |
Dave Hannah
|
|
|
late pm, screened - rebar // Mike Phone #: ###-####
|
BLD-Concrete | 7/28/2020 | 7/28/2020 | 7/28/2020 | P | PART |
Dave Hannah
|
|
|
slab on grade ok
|
BLD-Other | 7/27/2020 | 7/28/2020 | 7/28/2020 | A | PASS |
Dave Hannah
|
|
|
SCREENED // grout... as late as possible // Mike Phone #: ###-####
|
CHANGE STATUS TO (ISS) | | | 7/22/2020 | | DONE |
|
|
|
|
OVERRIDE | | | 7/21/2020 | | |
|
|
|
|
Permit Ready to Issue | | | 7/21/2020 | | DONE |
|
|
|
plan mod
|
Routing Off Site - STRUCTURAL | 7/13/2020 | | 7/20/2020 | | PASS |
Michael Hanson
|
|
|
STAPLEY
|
PLANS/APPL TAKEN TO FRONT DESK | | | 7/20/2020 | | DONE |
Michael Hanson
|
|
|
|
Plan assigned to (M_H) | 7/1/2020 | | 7/20/2020 | | DONE |
Michael Hanson
|
|
|
07/08 Plan mod - 505 Bannock
|
BLD-Footing | 7/13/2020 | 7/14/2020 | 7/17/2020 | P | PART |
Dave Hannah
|
|
|
Mike *screened* Phone #: ###-#### strct engineer and spec inspection both have ok rebar
|
BLD-Footing | 7/10/2020 | 7/13/2020 | 7/13/2020 | P | PEND |
Mike Jordan
|
|
|
Mike *screened* Phone #: ###-####. Grade beams. Noted that wngineer will be on site tomorrow morning to inspect reinforcement as well. Ok pending engineer approval. Stamped city plans not on site at time of inspection.
|
Plan Modification Accepted | | | 7/1/2020 | | DONE |
|
|
|
just says to see letter that will be submitted
|
BLD-Footing | 6/26/2020 | 6/29/2020 | 6/29/2020 | A | PART |
Dave Hannah
|
|
|
screened // Mike Phone #: ###-#### needs to resubmit struc foundation plan aproved by struc engineer crew will place conrete at their own risk
|
BLD-Conference | 6/26/2020 | 6/26/2020 | 6/26/2020 | P | DONE |
Mike Jordan
|
|
|
Needs to provide approved mix designs for concrete. Also needs to upload plan mod for udated structural sheet S1.11 showing new grade beam layout. Contractor want to place concrete Monday morning June 29th. Noted to contractor (Visser) that they will be placing concrete at their own risk and any non conformances will be repaired or replaced.
|
BLD-Footing | 6/11/2020 | 6/11/2020 | 6/12/2020 | P | PEND |
Dave Hannah
|
|
|
Screened- around 3pm, if possible- Jay Phone #: ###-#### ok after spec inspection okls
|
Issue PAID IN FULL permit | | | 6/1/2020 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 6/1/2020 | | DONE |
|
|
|
|
Routing Off Site - STRUCTURAL | 5/21/2020 | | 5/29/2020 | | PASS |
Michael Hanson
|
|
|
Chris M. @ Stapley engineering
|
PLANS/APPL TAKEN TO FRONT DESK | | | 5/29/2020 | | DONE |
Michael Hanson
|
|
|
|
Permit Ready to Issue | | | 5/29/2020 | | DONE |
|
|
|
ALL MET
METGC Form
METRevised Certificate of Value
METRP
|
Telephone call | | | 5/29/2020 | | DONE |
|
|
|
Sent email to Angie who will inform Developer of fees due.
|
Plan assigned to (M_H) | 3/23/2020 | | 5/29/2020 | | DONE |
Michael Hanson
|
|
|
1st review completed - 04/28 #502 L3 ePlan - 505 W Bannock Foundation/Grading
|
Routing PW Drainage | 5/22/2020 | | 5/22/2020 | | PASS |
Jason C. Taylor
|
|
|
|
Plan Reviewer's activity | | | 5/14/2020 | | DONE |
Greg Ruxton
|
|
|
Spoke with Todd Callahan about 120' distance from fire hydrant to FDC Connection. **GJR**
|
Routing PW Drainage | 5/12/2020 | | 5/12/2020 | | FAIL |
Jason C. Taylor
|
|
|
Need ACHD approval for Silva Cells in Right of Way. Upload ACHD approved stamped plans. Jason Taylor ###-####
|
Routing PW Street Lights | 5/12/2020 | | 5/12/2020 | | PASS |
Tom Marshall
|
|
|
Streetlights will be on BLD20-01095.
|
Routing PW Sewer Design | 5/11/2020 | | 5/11/2020 | | PASS |
DeAnn Brown
|
|
|
|
Routing - FIRE | 5/18/2020 | 5/18/2020 | 5/8/2020 | | PASS |
Greg Ruxton
|
|
|
Attached comments to case.
|
Route to Impact Fee Review | 4/30/2020 | 5/3/2020 | 5/1/2020 | | PASS |
Shannon Cade
|
|
|
Review requested for Commercial Permit
|
Routing - FIRE | 3/18/2020 | 3/23/2020 | 4/30/2020 | | FAIL |
Greg Ruxton
|
|
|
Attached comments to case and emailed architect.
|
1st review completed | | | 4/30/2020 | | FAIL |
Michael Hanson
|
|
|
|
Routing - PLAN CHECK | 3/23/2020 | | 4/29/2020 | | PASS |
Michael Hanson
|
|
|
|
Routing PW Environmental | 3/23/2020 | | 4/10/2020 | | PASS |
Zach Conde
|
|
|
PER ZACH:Grading and foundation plans. PASS
|
Routing Off Site - STRUCTURAL | 3/23/2020 | | 4/9/2020 | | FAIL |
Michael Hanson
|
|
|
Per Chris M. @ Stapley engineering
|
Routing PW Sewer Design | 3/23/2020 | | 4/2/2020 | | FAIL |
DeAnn Brown
|
|
|
See changemarks on sheet C5.00. Note to plug sewer service at the main for the existing service that will not be used.
|
Routing PW Drainage | 3/23/2020 | | 3/26/2020 | | FAIL |
Jason C. Taylor
|
|
|
See changemarks in ePlan.
|
Routing - PLUMBING | 3/23/2020 | | 3/26/2020 | | PASS |
Daryl Spivey
|
|
|
Per plan and ISPC.
|
Routing - Design Review | 3/23/2020 | | 3/26/2020 | | PASS |
Josh Wilson
|
|
|
|
Routing - Addressing | 3/23/2020 | | 3/24/2020 | | PASS |
Doug Chausow
|
|
|
|
Routing PW Street Lights | 3/23/2020 | | 3/24/2020 | | FAIL |
Tom Marshall
|
|
|
|
Routing PW Solid Waste | 3/23/2020 | | 3/24/2020 | | PASS |
Evan Carpenter
|
|
|
|
Routing - PUBLIC WORKS | 3/23/2020 | | 3/23/2020 | | PASS |
Morgan Webb
|
|
|
CORE TO COME THROUGH ON SEPERATE PERMIT.
|
Routing - PLANNING | 3/23/2020 | | 3/23/2020 | | PASS |
Karla Nelson
|
|
|
Current Planning Ok, Design Review sign-off needed.
|
Intake Approval | | | 3/18/2020 | | |
Jenny Nelson
|
|
|
|
Application received | | | 3/16/2020 | | DONE |
|
|
|
Application submitted via PDS Online on Mar 16 2020 4:22PM
|