BLD-Energy code compliance | 7/27/2020 | 7/27/2020 | 7/27/2020 | P | PASS |
Brandon Shaw
|
|
|
ok with Video/photo // Joe Phone #: ###-####
|
BLD-Framing/Rough-in | 7/22/2020 | 7/22/2020 | 7/22/2020 | P | PASS |
Brandon Shaw
|
|
|
virtual inspector // Amy Phone #: ###-####
|
BLD-Framing/Rough-in | 7/14/2020 | 7/14/2020 | 7/14/2020 | P | PART |
Brandon Shaw
|
|
|
OK to cover garage walls and ceiling lid...
|
BLD-Framing/Rough-in | 7/7/2020 | 7/8/2020 | 7/8/2020 | A | PASS |
Brandon Shaw
|
|
|
Shear walls...
|
BLD-Framing/Rough-in | 6/24/2020 | 6/24/2020 | 6/24/2020 | P | DONE |
Brandon Shaw
|
|
|
Framing consult...
|
Issue PAID IN FULL permit | | | 6/11/2020 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 6/11/2020 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 4/28/2020 | | DONE |
|
|
|
MET- OWNER ACTING AS GC//Need to confirm who will be the permit holder- parcel owner or GC
called Joe and left a message to get clarification
|
Plan assigned to (D_S) Debbie | 3/31/2020 | 3/31/2020 | 4/27/2020 | | DONE |
Debbie Sanine
|
|
|
|
Routing - PLAN CHECK | 4/27/2020 | | 4/27/2020 | | PASS |
Debbie Sanine
|
|
|
Energy-Yes ESC-No
|
PLANS/APPL TAKEN TO FRONT DESK | | | 4/27/2020 | | DONE |
Debbie Sanine
|
|
|
|
Routing - PLANNING | 4/7/2020 | | 4/7/2020 | | PASS |
Jeff Lowe
|
|
|
based on upper floor internal access.
|
Routing - PLAN CHECK | 4/6/2020 | | 4/6/2020 | | FAIL |
Debbie Sanine
|
|
|
|
Plan assigned to (JAB) Josh | 3/27/2020 | 3/27/2020 | 3/31/2020 | | DEFR |
Josh Bogle
|
|
|
04/02 addition, ePlan
|
Routing - PLAN CHECK | 3/27/2020 | | 3/31/2020 | | FAIL |
Josh Bogle
|
|
|
|
1st review completed | | | 3/31/2020 | | FAIL |
Debbie Sanine
|
|
|
|
Routing - PLANNING | 3/27/2020 | | 3/30/2020 | | FAIL |
Jeff Lowe
|
|
|
please provide a detailed floor plan. additionally, identify the point of ingress/egress
|
Telephone call | | | 3/27/2020 | | DONE |
|
|
|
will need to verify with parcel owner who is the permit holder going to be
|
Plans ACCEPTED BY PLAN TECH | | | 3/27/2020 | | DONE |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 3/27/2020 | | DONE |
|
|
|
nno intake fee -406
|
Intake Approval | | | 3/27/2020 | | PASS |
|
|
|
|
Application received | | | 3/17/2020 | | DONE |
|
|
|
Application submitted via PDS Online on Mar 17 2020 8:52AM
|