BLD-Energy code compliance | 6/18/2020 | 6/19/2020 | 6/19/2020 | A | PASS |
Brandon Shaw
|
|
|
Phone #: ###-#### Inspection requested via web by Kyle Seick
|
BLD-Other | 6/17/2020 | 6/18/2020 | 6/18/2020 | A | PASS |
Brandon Shaw
|
|
|
Soffit Phone #: ###-#### Inspection requested via web by Kyle Seick
|
BLD-Framing/Rough-in | 6/15/2020 | 6/16/2020 | 6/16/2020 | A | PASS |
Jim Storey
|
|
|
Phone #: ###-#### Inspection requested via web by Kyle Seick
|
BLD-Wall Bracing | 6/1/2020 | 6/1/2020 | 6/1/2020 | P | PASS |
Brandon Shaw
|
|
|
Phone #: ###-#### Inspection requested via web by Kyle Seick
|
BLD-Foundation | 4/21/2020 | 4/22/2020 | 4/22/2020 | P | PASS |
Brandon Shaw
|
|
|
Work in progress...
|
BLD-Footing | 4/21/2020 | 4/21/2020 | 4/21/2020 | P | PASS |
Brandon Shaw
|
|
|
Work in progress...
|
PubWorks Subgrade Approval | 4/16/2020 | 4/16/2020 | 4/16/2020 | | DONE |
Melissa Jannusch
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Melissa Jannusch ###-####.
|
Issue PAID IN FULL permit | | | 4/10/2020 | | DONE |
|
|
|
|
OVERRIDE | | | 4/9/2020 | | |
|
|
|
|
Permit Ready to Issue | | | 4/9/2020 | | DONE |
|
|
|
met
|
Plan assigned to (RDP) | 3/20/2020 | 3/20/2020 | 4/8/2020 | | DONE |
Rob Patrick
|
|
|
04/08 sfd L2 ePlan
|
Routing - PLAN CHECK | 3/20/2020 | | 4/8/2020 | | PASS |
Rob Patrick
|
|
|
|
1st review completed | | | 4/8/2020 | | DONE |
Rob Patrick
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 4/8/2020 | | DONE |
Rob Patrick
|
|
|
|
Routing PW Grading-Hillside | 3/20/2020 | | 3/30/2020 | | PASS |
Melissa Jannusch
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Please e-mail the stamped inspection approval letter to mjannusch@cityofboise.org and allow 24 hours for subgrade approval processing. Call Melissa Jannusch at ###-#### with questions.
The final inspection of the site grading and drainage work shall be done by the design engineer. Written approval shall be submitted to Boise Public Works prior to the issuance of the building final.
Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Melissa Jannusch at ###-####.
|
Routing - Erosion and Sediment | 3/20/2020 | | 3/24/2020 | | PASS |
Michael Zawacki
|
|
|
|
Route to Impact Fee Review | 3/20/2020 | 3/23/2020 | 3/23/2020 | | PASS |
Shannon Cade
|
|
|
Initial residential review of new SFD permits requested for now.
|
Routing - PLANNING | 3/20/2020 | | 3/23/2020 | | PASS |
Crystal Rain
|
|
|
|
Routing - FIRE | 3/20/2020 | 3/20/2020 | 3/20/2020 | | PASS |
Lee G Meredith
|
|
|
Sprinklers are not required. All measurements are within limits. No review comments provided.
|
Routing - Addressing | 3/20/2020 | | 3/20/2020 | | PASS |
Doug Chausow
|
|
|
|
Routing - PUBLIC WORKS | 3/20/2020 | | 3/20/2020 | | PASS |
Rita DeYoung
|
|
|
|
Routing - MECHANICAL | 3/20/2020 | | 3/20/2020 | | PASS |
Troy James
|
|
|
|
Intake Approval | | | 3/20/2020 | | PASS |
|
|
|
|
Application received | | | 3/17/2020 | | DONE |
|
|
|
Application submitted via PDS Online on Mar 17 2020 8:57AM
|