BLD-Energy code compliance | 7/17/2020 | 7/17/2020 | 7/17/2020 | P | PASS |
Dave Hannah
|
|
|
Phone #: ###-#### Inspection requested via web by Dustin Collins
|
BLD-Framing/Rough-in | 7/14/2020 | 7/15/2020 | 7/15/2020 | A | PASS |
Tony Young
|
|
|
Phone #: ###-#### Inspection requested via web by Dustin Collins// ok to insulate
|
BLD-Framing/Rough-in | 7/14/2020 | 7/14/2020 | 7/14/2020 | P | PEND |
Tony Young
|
|
|
Phone #: ###-#### Inspection requested via web by Dustin Collins
|
BLD-Framing/Rough-in | 7/10/2020 | 7/14/2020 | 7/14/2020 | A | NR |
Tony Young
|
|
|
Phone #: ###-#### Inspection requested via web by Dustin Collins// needs a mech permit and rough in
|
BLD-Wall Bracing | 6/17/2020 | 6/18/2020 | 6/18/2020 | P | PART |
Tony Young
|
|
|
Selected "wall bracing" - needing a sheer inspection Phone #: ###-#### Inspection requested via web by Dustin Collins// exterior ok after renailing some areas
|
BLD-Foundation | 5/19/2020 | 5/19/2020 | 5/19/2020 | A | PASS |
Tony Young
|
|
|
pour at noon; Phone #: ###-####
|
BLD-Footing | 5/18/2020 | 5/18/2020 | 5/18/2020 | P | PART |
Tony Young
|
|
|
Phone #: ###-####
|
BLD-Conference | 5/15/2020 | 5/15/2020 | 5/18/2020 | P | PASS |
Tony Young
|
|
|
Phone #: ###-####,, ?s on design,, per plan..
|
Fees Due Hold | 5/14/2020 | | 5/15/2020 | | DONE |
|
|
|
|
OVERRIDE | | | 5/13/2020 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 5/13/2020 | | DONE |
|
|
|
|
Telephone call | | | 5/13/2020 | | DONE |
|
|
|
send an email to Dustin to informed him that there were some fees that were missed
|
Permit Ready to Issue | | | 5/13/2020 | | DONE |
|
|
|
met
|
Plan assigned to (RDP) | 3/24/2020 | 3/24/2020 | 5/12/2020 | | DONE |
Rob Patrick
|
|
|
2nd Review Complete 04/13 Failed: 04/06 sfd L1 ePlan
|
Routing - PLANNING | 5/12/2020 | | 5/12/2020 | | PASS |
Crystal Rain
|
|
|
|
Routing - PLAN CHECK | 5/12/2020 | | 5/12/2020 | | PASS |
Rob Patrick
|
|
|
Please charge 3 hours of review time at $55/hour for file corrections
|
PLANS/APPL TAKEN TO FRONT DESK | | | 5/12/2020 | | DONE |
Rob Patrick
|
|
|
Please charge 3 hours of review time at $55/hour for file corrections
|
Routing - PLANNING | 5/11/2020 | | 5/11/2020 | | FAIL |
Crystal Rain
|
|
|
Need updated site plan reflecting correc parking configuration. May be related to ePlan issues.
|
Routing - PLAN CHECK | 5/11/2020 | | 5/11/2020 | | FAIL |
Rob Patrick
|
|
|
Corrections Required
|
Routing - PLANNING | 5/4/2020 | | 5/4/2020 | | FAIL |
Crystal Rain
|
|
|
Need to see entire common drive to ensure parking is setback 20' away.
|
Routing - PLAN CHECK | 5/4/2020 | | 5/4/2020 | | FAIL |
Rob Patrick
|
|
|
File names need to be exactly same as original submittal
|
Plan Reviewer's activity | | | 5/1/2020 | | |
Rob Patrick
|
|
|
This Permit Request is ready to Fail pending Planning review.
|
Routing - PLAN CHECK | 4/13/2020 | | 4/13/2020 | | FAIL |
Rob Patrick
|
|
|
Comment not addressed
|
Routing - PLANNING | 4/13/2020 | | 4/13/2020 | | FAIL |
Crystal Rain
|
|
|
Driveway needs to be reconfigured based on common drive easement as defined in ROS 11312 and include 3' buffer along property line. Also need to show required parking outside of setbacks.
|
Routing - PLAN CHECK | 3/24/2020 | | 4/6/2020 | | FAIL |
Rob Patrick
|
|
|
Corrections Req'd
|
1st review completed | | | 4/6/2020 | | FAIL |
Rob Patrick
|
|
|
Corrections Req'd
|
Route to Impact Fee Review | 3/24/2020 | 3/27/2020 | 3/25/2020 | | PASS |
Shannon Cade
|
|
|
Initial residential review of new SFD permits requested for now.
|
Routing - MECHANICAL | 3/24/2020 | | 3/25/2020 | | PASS |
Chad Schwendiman
|
|
|
|
Routing - PLANNING | 3/24/2020 | | 3/25/2020 | | FAIL |
Crystal Rain
|
|
|
Returned because detached accessory buildings cannot be located in the front of a home without a Conditional Use Permit, the site plan does not clearly indicate where the front property line is, and the site plan does not show the driveway.
|
Routing - Addressing | 3/24/2020 | | 3/25/2020 | | PASS |
Doug Chausow
|
|
|
|
Routing - PUBLIC WORKS | 3/24/2020 | | 3/25/2020 | | PASS |
Candy A. Nichols
|
|
|
|
Intake Approval | | | 3/24/2020 | | FAIL |
|
|
|
1. All drawings must be loaded as individual sheets and named according to ePlan Submittal Standards:
2. ACCA Report (Manual J) is required
|
Plans ACCEPTED BY PLAN TECH | | | 3/24/2020 | | DONE |
|
|
|
|
Intake Approval | | | 3/24/2020 | | PASS |
|
|
|
|
Application received | | | 3/17/2020 | | DONE |
|
|
|
Application submitted via PDS Online on Mar 17 2020 9:24AM
|