Information based on query as of Wednesday, August 14, 2024.
Permit Information
Permit NumberBLD20-00953
StatusFinaled
Name TUCKER MATERIAL HANDLING
Site Address 9605 S EISENMAN RD
Project NameVerde Fulfullment USA
Customer Number 
ePlanReviewYes
Description
(VERDE FULFILLMENT) **Special inspections required** Permit to install steel storage racking exceeding 8' in height within the warehouse space per approved plans and structural engineering. New building and tenant improvements done under BLD19-03269 and BLD20-00356. Approval of this permit is contingent on adhering to approved plans and engineering. Work to include: installation of prefabricated 24'-0" tall storage racking with anticipated storage up to 28'-0", and prefabricated 16'-0" tall storage racking with anticipated storage up to 18'-0", including seismic bolting to existing slab, the design, testing and utilization of industrial steel storage racks shall be in accordance with the RMI Specification for the Design, Testing and Utilization of Industrial Steel Storage Racks. The structural engineering has been provided by Seizmic Inc.. Engineering is attached.
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final8/11/20208/13/20208/13/2020PPASS
DetailsJim Storey
SCREENED // if possbile would like fire inspector to come with you Fred Phone #: ###-####
DOC - Permit Finaled8/13/20208/13/20208/13/2020PPASS
DetailsJim Storey
FIRE-Final Inspection8/13/20208/13/20208/13/2020PPASS
DetailsJim Page
Life fire safety inspection for racking complete.

Fred */Screened*/ Phone #: ###-####
BLD-Final7/15/20207/16/20207/16/2020PPASS
DetailsJim Storey
for TCO screened // Fred Phone #: ###-#### south half ok to stock.
FIRE-Final Inspection7/15/20207/16/20207/16/2020APART
DetailsTroy Cobbley
Can be finaled when the installation of the fire extinguishers have been installed by the end of today. Per documentation provided ESFR sprinkler heads are being used which allows no column protection as per NFPA 13.

screened // Fred Phone #: ###-####
Issue PAID IN FULL permit  5/26/2020 DONE
Inspection Record Card- Bld  5/26/2020 DONE
Plan assigned to (J_N)4/15/20204/15/20205/22/2020 DONE
Details
1st complete 04/28 Verde Racking L-2
Routing - PLAN CHECK5/22/2020 5/22/2020 PASS
DetailsJenny Nelson
PLANS/APPL TAKEN TO FRONT DESK  5/22/2020 DONE
DetailsJenny Nelson
Permit Ready to Issue  5/22/2020 DONE
met-Need-
GC form
Routing - PLAN CHECK5/20/2020 5/20/2020 FAIL
DetailsJenny Nelson
No corrections to plan sheet, need fully filled out 310 form
Routing - FIRE5/19/20205/19/20205/19/2020 PASS
DetailsMark Stumbaugh
No review needed. No changes from previous review
Routing - FIRE4/15/20204/15/20204/24/2020 PASS
DetailsMark Stumbaugh
Racking permit
1st review completed  4/24/2020 DONE
DetailsJenny Nelson
Routing - PLAN CHECK4/15/2020 4/24/2020 FAIL
Details
Complete 310 form, clarify notes, make information readable on sheets
Intake Approval  4/10/2020 PASS
Intake Approval  3/30/2020 FAIL
DetailsMichael Hanson
Files have been uploaded as multi-page. All sheets must be individually uploaded.
All sheets must be mono-chrome no color.
Form 606 is required provide completed and signed.
There are two layouts for Type a racking. Provide only one.
Contact Mark Stumbaugh for prescreen comments ###-####
Application received  3/17/2020 DONE
Application submitted via PDS Online on Mar 17 2020 12:25PM
First Notice8/13/20208/13/2020   
DetailsJim Storey