BLD-Framing/Rough-in | 5/7/2020 | 5/8/2020 | 5/8/2020 | A | PART |
Brandon Shaw
|
|
|
Pending Ele for cover...
|
BLD-Footing | 4/30/2020 | 5/1/2020 | 5/1/2020 | A | PEND |
Brandon Shaw
|
|
|
Provide Geo soils approval, abandoned backfilled pool found in footings location...
|
Issue PAID IN FULL permit | | | 4/13/2020 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 4/13/2020 | | DONE |
|
|
|
|
Plan assigned to (JAB) Josh | 3/24/2020 | 3/24/2020 | 4/7/2020 | | PASS |
Josh Bogle
|
|
|
03/30 patio cover, ePlan - 1st done
|
Routing - PLAN CHECK | 4/7/2020 | | 4/7/2020 | | PASS |
Josh Bogle
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 4/7/2020 | | DONE |
Josh Bogle
|
|
|
ESC no - Energy no
|
Permit Ready to Issue | | | 4/7/2020 | | DONE |
|
|
|
met
|
Routing - PLAN CHECK | 4/3/2020 | | 4/3/2020 | | FAIL |
Josh Bogle
|
|
|
see notes in ePlan
|
1st review completed | | | 3/27/2020 | | FAIL |
Josh Bogle
|
|
|
|
Routing - PLAN CHECK | 3/24/2020 | | 3/27/2020 | | FAIL |
Josh Bogle
|
|
|
see notes in ePlan
|
Routing - PLANNING | 3/24/2020 | | 3/24/2020 | | PASS |
Crystal Rain
|
|
|
|
Intake Approval | | | 3/24/2020 | | PASS |
|
|
|
Confirm RCE #: last digit missing on application
|
Application received | | | 3/20/2020 | | DONE |
|
|
|
Application submitted via PDS Online on Mar 20 2020 10:54AM
|
Intake Approval | | | 3/20/2020 | | FAIL |
|
|
|
1. Please show parcel site plan with setback dimensions (distance to property lines from corners of proposed structure)
|