BLD-Framing/Rough-in | 7/22/2020 | 7/23/2020 | 7/23/2020 | A | NR |
Tell Riley
|
|
|
ok with video or photo // Jim Phone #: ###-####//need electrical roughed in and inspected//mechanical needs roughed in and inspected//provide truss detail for connections to girders//
|
BLD-Wall Bracing | 6/16/2020 | 6/16/2020 | 6/16/2020 | P | PASS |
Tell Riley
|
|
|
ok to wrap when nails added as dicussed//
|
BLD-Framing/Rough-in | 6/15/2020 | 6/16/2020 | 6/16/2020 | P | CANC |
Tell Riley
|
|
|
James *screened* Phone #: ###-####
|
BLD-Framing/Rough-in | 6/8/2020 | 6/9/2020 | 6/9/2020 | A | NR |
Tell Riley
|
|
|
James *screened* Phone #: ###-####//inspection used as a conference//
|
BLD-Foundation | 5/4/2020 | 5/5/2020 | 5/5/2020 | A | PASS |
Mike Jordan
|
|
|
Brandon Phone #: ###-####
|
BLD-Footing | 4/30/2020 | 4/30/2020 | 4/30/2020 | P | PASS |
Tell Riley
|
|
|
Brandon Phone #: ###-####//side setbacks maintain existing//40 plus feet in rear//ok per plans//
|
Issue PAID IN FULL permit | | | 4/13/2020 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 4/13/2020 | | DONE |
|
|
|
|
Telephone call | | | 4/13/2020 | | DONE |
|
|
|
release eplan
|
OVERRIDE | | | 4/9/2020 | | |
|
|
|
|
Plan assigned to (JAB) Josh | 3/25/2020 | 3/25/2020 | 4/9/2020 | | PASS |
Josh Bogle
|
|
|
03/31 addition, ePlan - 1st done
|
Routing - PLANNING | 4/9/2020 | | 4/9/2020 | | PASS |
Crystal Rain
|
|
|
|
Routing - PLAN CHECK | 4/9/2020 | | 4/9/2020 | | PASS |
Josh Bogle
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 4/9/2020 | | DONE |
Josh Bogle
|
|
|
ESC yes - Energy yes
|
Permit Ready to Issue | | | 4/9/2020 | | DONE |
|
|
|
MET
Need RP
|
Routing - PLAN CHECK | 3/25/2020 | | 3/30/2020 | | FAIL |
Josh Bogle
|
|
|
see notes in ePlan
|
1st review completed | | | 3/30/2020 | | FAIL |
Josh Bogle
|
|
|
|
Routing - PLANNING | 3/25/2020 | | 3/25/2020 | | FAIL |
Crystal Rain
|
|
|
Need site plan to show use in new addition; height dimensions missing.
|
Plans ACCEPTED BY PLAN TECH | | | 3/25/2020 | | DONE |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 3/25/2020 | | DONE |
|
|
|
|
Intake Approval | | | 3/25/2020 | | PASS |
|
|
|
|
Application received | | | 3/22/2020 | | DONE |
|
|
|
Application submitted via PDS Online on Mar 22 2020 11:21AM
|