BLD-Framing/Rough-in | 6/5/2020 | 6/8/2020 | 6/8/2020 | A | PASS |
Mike Jordan
|
|
|
Ben Phone #: ###-####
|
BLD-Wall Bracing | 6/5/2020 | 6/8/2020 | 6/8/2020 | A | PASS |
Mike Jordan
|
|
|
shear // Ben Phone #: ###-####
|
Permit Ready to Issue | | | 3/30/2020 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 3/30/2020 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 3/30/2020 | | DONE |
|
|
|
|
Telephone call | | | 3/30/2020 | | DONE |
|
|
|
eplan needs to be release
|
Plan assigned to (JAB) Josh | 3/24/2020 | 3/24/2020 | 3/27/2020 | | PASS |
Josh Bogle
|
|
|
03/30 alteration, ePlan - 1st done
|
Plan Modification Accepted | | | 3/27/2020 | | DONE |
Josh Bogle
|
|
|
TCH split plan sheets for the applicant - I called and left a message with the engineer asking for a header call-out
|
Routing - PLAN CHECK | 3/27/2020 | | 3/27/2020 | | PASS |
Josh Bogle
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 3/27/2020 | | DONE |
Josh Bogle
|
|
|
ESC no - Energy no
|
Routing - PLAN CHECK | 3/24/2020 | | 3/26/2020 | | FAIL |
Josh Bogle
|
|
|
plans not legible
|
1st review completed | | | 3/26/2020 | | FAIL |
Josh Bogle
|
|
|
|
Routing - PLANNING | 3/24/2020 | | 3/25/2020 | | PASS |
Crystal Rain
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 3/24/2020 | | DONE |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 3/24/2020 | | DONE |
|
|
|
|
Intake Approval | | | 3/24/2020 | | PASS |
|
|
|
|
Application received | | | 3/23/2020 | | DONE |
|
|
|
Application submitted via PDS Online on Mar 23 2020 11:00AM
|
Intake Approval | | | 3/23/2020 | | FAIL |
|
|
|
Plans must be uploaded as individual sheets. I have deleted the drawings so that you may upload them as separate sheets.
|