BLD-Concrete | 6/9/2020 | 6/10/2020 | 6/10/2020 | A | PASS |
Tony Young
|
|
|
screened // Brodie Phone #: ###-####
|
Telephone call | | | 5/27/2020 | | DONE |
|
|
|
Emailed GC a 302 form to fill out. The form in eplan doesnt match the company on the application.
|
Issue PAID IN FULL permit | | | 5/27/2020 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 5/27/2020 | | DONE |
|
|
|
|
Plan assigned to (JAB) Josh | 3/30/2020 | 3/30/2020 | 5/13/2020 | | PASS |
Josh Bogle
|
|
|
03/30 pool, ePlan - 1st done
|
Routing - PLANNING | 5/13/2020 | | 5/13/2020 | | PASS |
Crystal Rain
|
|
|
|
Routing - PLAN CHECK | 5/13/2020 | | 5/13/2020 | | PASS |
Josh Bogle
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 5/13/2020 | | DONE |
Josh Bogle
|
|
|
ESC no - Energy no
|
Permit Ready to Issue | | | 5/13/2020 | | DONE |
|
|
|
MET
Need GC form that reflects the RCE number. GC form in ePlan says Idaho Pool and Spa. RCE number is for S&E cement.
|
Plan Reviewer's activity | | | 5/12/2020 | | DONE |
Josh Bogle
|
|
|
accepted and routed resubmittal
|
Plan Reviewer's activity | | | 5/11/2020 | | DONE |
Josh Bogle
|
|
|
accepted and routed resubmittal
|
Routing - PLANNING | 5/11/2020 | | 5/11/2020 | | FAIL |
Crystal Rain
|
|
|
In-ground, attached pool cover still needs to be moved out of 3' setback.
|
Routing - PLAN CHECK | 5/11/2020 | | 5/11/2020 | | FAIL |
Josh Bogle
|
|
|
no review pending Planning approval
|
Routing - PLAN CHECK | 5/8/2020 | | 5/8/2020 | | FAIL |
Josh Bogle
|
|
|
no review pending Plannning approval
|
Routing - PLANNING | 4/28/2020 | | 4/28/2020 | | FAIL |
Crystal Rain
|
|
|
The in-ground, attached pool cover needs to be moved out of the 3' setback.
|
1st review completed | | | 3/30/2020 | | FAIL |
Josh Bogle
|
|
|
|
Routing - PLAN CHECK | 3/25/2020 | | 3/30/2020 | | FAIL |
Josh Bogle
|
|
|
see notes in ePlan
|
Application received | | | 3/25/2020 | | DONE |
|
|
|
Application submitted via PDS Online on Mar 25 2020 8:49AM
|
Plans ACCEPTED BY PLAN TECH | | | 3/25/2020 | | DONE |
|
|
|
|
Intake Approval | | | 3/25/2020 | | PASS |
|
|
|
|
Routing - PLANNING | 3/25/2020 | | 3/25/2020 | | FAIL |
Crystal Rain
|
|
|
The drawing shows three feet from property line to water's edge, not the pool apron or splashguard, as required by code. Please submit drawings with adjusted pool location and that clearly show that the height of the pool and safety cover is one foot or less, as measured from the property’s finished grade.
|