BLD-Final | 7/16/2020 | 7/17/2020 | 7/16/2020 | P | PASS |
Dave Hannah
|
|
|
screened // Brendan Phone #: ###-####
|
DOC - Permit Finaled | 7/16/2020 | 7/16/2020 | 7/16/2020 | P | PASS |
Dave Hannah
|
|
|
|
(F) Reprint permit | | | 7/16/2020 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 7/16/2020 | | DONE |
|
|
|
|
Telephone call | | | 7/16/2020 | | DONE |
|
|
|
spoke with GC and told him we need a signed permit. I emailed one to him for signature.
|
BLD-Energy code compliance | 5/1/2020 | 5/1/2020 | 5/2/2020 | P | PASS |
Dave Hannah
|
|
|
ok video/photo // Brendon Phone #: ###-####
|
BLD-Framing/Rough-in | 4/29/2020 | 4/30/2020 | 4/30/2020 | P | PASS |
Dave Hannah
|
|
|
Brendan **cleared** Phone #: ###-####
|
Issue PAID IN FULL permit | | | 4/28/2020 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 4/28/2020 | | DONE |
|
|
|
|
Plan assigned to (JAB) Josh | 3/27/2020 | 3/27/2020 | 4/27/2020 | | PASS |
Josh Bogle
|
|
|
04/02 remodel, ePlan - 1st done
|
Routing - Design Review | 4/24/2020 | | 4/27/2020 | | PASS |
Michaella Owens
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 4/27/2020 | | DONE |
Josh Bogle
|
|
|
ESC no - Energy no
|
Permit Ready to Issue | | | 4/27/2020 | | DONE |
|
|
|
MET
|
Routing - PLAN CHECK | 4/24/2020 | | 4/24/2020 | | PASS |
Josh Bogle
|
|
|
|
Routing - PLAN CHECK | 4/9/2020 | | 4/17/2020 | | FAIL |
Josh Bogle
|
|
|
see notes in ePlan
|
Routing - Design Review | 4/17/2020 | | 4/17/2020 | | FAIL |
Michaella Owens
|
|
|
|
Plan Modification Accepted | | | 4/9/2020 | | DONE |
Josh Bogle
|
|
|
accepted Mod - routed to DR for Historic Review
|
Plan Modification Accepted | | | 4/7/2020 | | FAIL |
Josh Bogle
|
|
|
zero drawings
|
Routing - PLAN CHECK | 3/27/2020 | | 4/1/2020 | | FAIL |
Josh Bogle
|
|
|
see notes in ePlan - also called and chatted with applicants
|
1st review completed | | | 4/1/2020 | | FAIL |
Josh Bogle
|
|
|
|
Telephone call | | | 4/1/2020 | | DONE |
|
|
|
Spoke with home owner. The plans that were submitted had incorrect information on them. Was asked for them to be deleted so they can upload the correct information.
|
Application received | | | 3/27/2020 | | DONE |
|
|
|
Application submitted via PDS Online on Mar 27 2020 9:01AM
|
Plans ACCEPTED BY PLAN TECH | | | 3/27/2020 | | DONE |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 3/27/2020 | | DONE |
|
|
|
no intake fee taken
|
Intake Approval | | | 3/27/2020 | | PASS |
|
|
|
|