Permit for the construction of a new 3124 sq. ft., two story (first story 2143 sq. ft., second story 981 sq. ft) single family dwelling with 5 bedrooms, 2.5 bathrooms, approximately 214 sq. ft. of covered patio/porch and a 610 sq. ft. attached garage per the approved plans and any notations. Prescriptive Energy Compliance. R-1C zoning and setbacks per planning. ***RDP*** ***Sprinklers are not required***LGM
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Energy code compliance8/11/20208/12/20208/12/2020APASS
DetailsBrandon Shaw
Early am please Phone #: ###-#### Inspection requested via web by Daniel Appel
BLD-Energy code compliance8/10/20208/12/20208/11/2020PCANC
DetailsDave Hannah
Dan Phone #: ###-#### >> Inspection requested via web by Daniel Appel Inspection cancelled from web by: Daniel Appel
BLD-Framing/Rough-in8/5/20208/6/20208/6/2020PPASS
DetailsDave Hannah
Dan Phone #: ###-#### Inspection requested via web by Daniel Appel
BLD-Wall Bracing6/26/20206/29/20206/29/2020APASS
DetailsDave Hannah
Early am please Phone #: ###-#### Inspection requested via web by Daniel Appel
BLD-Wall Bracing6/24/20206/25/20206/25/2020ANR
DetailsDave Hannah
Exterior shear nailing Phone #: ###-#### Inspection requested via web by Daniel Appel
BLD-Wall Bracing6/22/20206/24/20206/24/2020AFAIL
DetailsDave Hannah
Dan Phone #: ###-#### Inspection requested via web by Daniel Appel needs to install missing hold downs and nail up hold downs
BLD-Wall Bracing6/19/20206/23/20206/22/2020ACANC
DetailsDave Hannah
Dan Phone #: ###-#### >> Inspection requested via web by Daniel Appel Inspection cancelled from web by: Daniel Appel
BLD-Foundation5/15/20205/15/20205/15/2020PPASS
DetailsJim Storey
wall // Nathan Phone #: ###-####
BLD-Footing5/8/20205/11/20205/11/2020APART
DetailsDave Hannah
Chris Phone #: ###-#### set backs ok crew still working on rebar
BLD-Footing5/8/20205/8/20205/8/2020PNR
DetailsDave Hannah
Chris Phone #: ###-####
Issue PAID IN FULL permit  5/1/2020 DONE
Inspection Record Card- Bld  5/1/2020 DONE
OVERRIDE  4/30/2020  
Plan assigned to (RDP)4/28/20204/28/20204/30/2020 DONE
DetailsRob Patrick
05/05 Plan Mod
Routing - PLAN CHECK4/28/2020 4/30/2020 PASS
DetailsRob Patrick
PLANS/APPL TAKEN TO FRONT DESK  4/30/2020 DONE
DetailsRob Patrick
Permit Ready to Issue  4/30/2020 DONE
met
Routing - PLANNING4/29/2020 4/29/2020 PASS
DetailsSue Cummings
Still good
Plan resubmittals received  4/28/2020 DONE
want to change location for home on site plan
CHANGE STATUS TO (REV)  4/28/2020 DONE
OVERRIDE  4/17/2020  
Plan assigned to (RDP)3/30/20203/30/20204/17/2020 DONE
DetailsRob Patrick
2nd Review Complete 04/16 FAILED Comments not Addressed: 04/16 sfd L2 ePlan
Routing - PLAN CHECK4/17/2020 4/17/2020 PASS
DetailsRob Patrick
PLANS/APPL TAKEN TO FRONT DESK  4/17/2020 DONE
DetailsRob Patrick
Permit Ready to Issue  4/17/2020 DONE
met
Routing - PLAN CHECK4/16/2020 4/16/2020 FAIL
DetailsRob Patrick
Comments not Addressed
1st review completed  4/14/2020 FAIL
DetailsRob Patrick
Corrections Req'd
Routing - PLAN CHECK3/30/2020 4/14/2020 FAIL
DetailsRob Patrick
Corrections Req'd
Routing - Erosion and Sediment3/30/2020 4/3/2020 PASS
DetailsAndy J. Long
No ESC plan required. This is flat lot within the designated hillside. ESC General Permit will be issued. Concrete washout containment, storm drain sediment protection, and regular housekeeping will be required.
Routing - PLANNING3/30/2020 4/1/2020 PASS
DetailsLeon Letson
Route to Impact Fee Review3/30/20204/2/20203/31/2020 PASS
DetailsShannon Cade
Initial residential review of new SFD permits requested for now.
Routing - FIRE3/30/20203/30/20203/31/2020 PASS
DetailsLee G Meredith
New SFH
All measurments are within acceptable limits. Sprinklers are not required.
Routing - Addressing3/30/2020 3/31/2020 PASS
DetailsDoug Chausow
Address: 612 N Pierce St
Routing - PUBLIC WORKS3/30/2020 3/31/2020 PASS
DetailsCandy A. Nichols
Routing - MECHANICAL3/30/2020 3/31/2020 PASS
DetailsTroy James
Intake Approval  3/30/2020 PASS
Application received  3/27/2020 DONE
Application submitted via PDS Online on Mar 27 2020 9:04AM
Telephone call  3/27/2020 DONE
Per Christina, This applicaiton should be a 404. Will continue the app as 402 on e-plan and tidemark. Need 404 checklist for prescreen approval.