BLD-Energy code compliance | 8/11/2020 | 8/12/2020 | 8/12/2020 | A | PASS |
Brandon Shaw
|
|
|
Early am please Phone #: ###-#### Inspection requested via web by Daniel Appel
|
BLD-Energy code compliance | 8/10/2020 | 8/12/2020 | 8/11/2020 | P | CANC |
Dave Hannah
|
|
|
Dan Phone #: ###-#### >> Inspection requested via web by Daniel Appel Inspection cancelled from web by: Daniel Appel
|
BLD-Framing/Rough-in | 8/5/2020 | 8/6/2020 | 8/6/2020 | P | PASS |
Dave Hannah
|
|
|
Dan Phone #: ###-#### Inspection requested via web by Daniel Appel
|
BLD-Wall Bracing | 6/26/2020 | 6/29/2020 | 6/29/2020 | A | PASS |
Dave Hannah
|
|
|
Early am please Phone #: ###-#### Inspection requested via web by Daniel Appel
|
BLD-Wall Bracing | 6/24/2020 | 6/25/2020 | 6/25/2020 | A | NR |
Dave Hannah
|
|
|
Exterior shear nailing Phone #: ###-#### Inspection requested via web by Daniel Appel
|
BLD-Wall Bracing | 6/22/2020 | 6/24/2020 | 6/24/2020 | A | FAIL |
Dave Hannah
|
|
|
Dan Phone #: ###-#### Inspection requested via web by Daniel Appel needs to install missing hold downs and nail up hold downs
|
BLD-Wall Bracing | 6/19/2020 | 6/23/2020 | 6/22/2020 | A | CANC |
Dave Hannah
|
|
|
Dan Phone #: ###-#### >> Inspection requested via web by Daniel Appel Inspection cancelled from web by: Daniel Appel
|
BLD-Foundation | 5/15/2020 | 5/15/2020 | 5/15/2020 | P | PASS |
Jim Storey
|
|
|
wall // Nathan Phone #: ###-####
|
BLD-Footing | 5/8/2020 | 5/11/2020 | 5/11/2020 | A | PART |
Dave Hannah
|
|
|
Chris Phone #: ###-#### set backs ok crew still working on rebar
|
BLD-Footing | 5/8/2020 | 5/8/2020 | 5/8/2020 | P | NR |
Dave Hannah
|
|
|
Chris Phone #: ###-####
|
Issue PAID IN FULL permit | | | 5/1/2020 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 5/1/2020 | | DONE |
|
|
|
|
OVERRIDE | | | 4/30/2020 | | |
|
|
|
|
Plan assigned to (RDP) | 4/28/2020 | 4/28/2020 | 4/30/2020 | | DONE |
Rob Patrick
|
|
|
05/05 Plan Mod
|
Routing - PLAN CHECK | 4/28/2020 | | 4/30/2020 | | PASS |
Rob Patrick
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 4/30/2020 | | DONE |
Rob Patrick
|
|
|
|
Permit Ready to Issue | | | 4/30/2020 | | DONE |
|
|
|
met
|
Routing - PLANNING | 4/29/2020 | | 4/29/2020 | | PASS |
Sue Cummings
|
|
|
Still good
|
Plan resubmittals received | | | 4/28/2020 | | DONE |
|
|
|
want to change location for home on site plan
|
CHANGE STATUS TO (REV) | | | 4/28/2020 | | DONE |
|
|
|
|
OVERRIDE | | | 4/17/2020 | | |
|
|
|
|
Plan assigned to (RDP) | 3/30/2020 | 3/30/2020 | 4/17/2020 | | DONE |
Rob Patrick
|
|
|
2nd Review Complete 04/16 FAILED Comments not Addressed: 04/16 sfd L2 ePlan
|
Routing - PLAN CHECK | 4/17/2020 | | 4/17/2020 | | PASS |
Rob Patrick
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 4/17/2020 | | DONE |
Rob Patrick
|
|
|
|
Permit Ready to Issue | | | 4/17/2020 | | DONE |
|
|
|
met
|
Routing - PLAN CHECK | 4/16/2020 | | 4/16/2020 | | FAIL |
Rob Patrick
|
|
|
Comments not Addressed
|
1st review completed | | | 4/14/2020 | | FAIL |
Rob Patrick
|
|
|
Corrections Req'd
|
Routing - PLAN CHECK | 3/30/2020 | | 4/14/2020 | | FAIL |
Rob Patrick
|
|
|
Corrections Req'd
|
Routing - Erosion and Sediment | 3/30/2020 | | 4/3/2020 | | PASS |
Andy J. Long
|
|
|
No ESC plan required. This is flat lot within the designated hillside. ESC General Permit will be issued. Concrete washout containment, storm drain sediment protection, and regular housekeeping will be required.
|
Routing - PLANNING | 3/30/2020 | | 4/1/2020 | | PASS |
Leon Letson
|
|
|
|
Route to Impact Fee Review | 3/30/2020 | 4/2/2020 | 3/31/2020 | | PASS |
Shannon Cade
|
|
|
Initial residential review of new SFD permits requested for now.
|
Routing - FIRE | 3/30/2020 | 3/30/2020 | 3/31/2020 | | PASS |
Lee G Meredith
|
|
|
New SFH
All measurments are within acceptable limits. Sprinklers are not required.
|
Routing - Addressing | 3/30/2020 | | 3/31/2020 | | PASS |
Doug Chausow
|
|
|
Address: 612 N Pierce St
|
Routing - PUBLIC WORKS | 3/30/2020 | | 3/31/2020 | | PASS |
Candy A. Nichols
|
|
|
|
Routing - MECHANICAL | 3/30/2020 | | 3/31/2020 | | PASS |
Troy James
|
|
|
|
Intake Approval | | | 3/30/2020 | | PASS |
|
|
|
|
Application received | | | 3/27/2020 | | DONE |
|
|
|
Application submitted via PDS Online on Mar 27 2020 9:04AM
|
Telephone call | | | 3/27/2020 | | DONE |
|
|
|
Per Christina, This applicaiton should be a 404. Will continue the app as 402 on e-plan and tidemark. Need 404 checklist for prescreen approval.
|