Information based on query as of Wednesday, July 24, 2024.
Permit Information
Permit NumberBLD20-01089
StatusIssued
Name KEILTY REMODELING
Site Address 2041 E PARKSIDE DR
Project NameLivingston front exterior
Customer Number 
ePlanReviewYes
Description
HILLSIDE - WUI - Permit to add a 196sq' (14'x14' deck) and a 240sq' covered Entry. All work per plans, engineering, local codes & ordinances. **JAB**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Foundation5/18/20205/18/20205/18/2020PPASS
DetailsBrandon Shaw
Greg Phone #: ###-####
BLD-Footing5/14/20205/14/20205/14/2020PPASS
DetailsBrandon Shaw
screened // John Phone #: ###-####
PubWorks Subgrade Approval5/13/20205/13/20205/13/2020 DONE
DetailsMelissa Jannusch
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Melissa Jannusch ###-####.

BLD-Framing/Rough-in5/7/20205/7/20205/7/2020PPART
DetailsBrandon Shaw
Covered patio only...
Inspection Record Card- Bld  4/20/2020 DONE
Issue PAID IN FULL permit  4/17/2020 DONE
Plan assigned to (JAB) Josh3/30/20203/30/20204/16/2020 PASS
DetailsJosh Bogle
04/03 addition, ePlan - 1st done
Routing - PLAN CHECK4/16/2020 4/16/2020 PASS
DetailsJosh Bogle
PLANS/APPL TAKEN TO FRONT DESK  4/16/2020 DONE
DetailsJosh Bogle
ESC no - Energy no
Permit Ready to Issue  4/16/2020 DONE
Routing - PLAN CHECK4/10/2020 4/10/2020 FAIL
DetailsJosh Bogle
needs engineering
1st review completed  4/6/2020 FAIL
DetailsJosh Bogle
Routing - Erosion and Sediment4/1/2020 4/3/2020 PASS
DetailsAndy J. Long
VOID. Minimal exterior disturbance & excavation. No ESC permit required.
Routing - PLAN CHECK3/30/2020 4/2/2020 FAIL
DetailsJosh Bogle
see notes in ePlan and e-mail to Chris
Routing PW Grading-Hillside4/1/2020 4/1/2020 PASS
DetailsMelissa Jannusch
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Please e-mail the stamped inspection approval letter to mjannusch@cityofboise.org and allow 24 hours for subgrade approval processing. Call Melissa Jannusch at ###-#### with questions.

Routing - PLANNING3/30/2020 3/31/2020 PASS
DetailsCrystal Rain
Application received  3/30/2020 DONE
Application submitted via PDS Online on Mar 30 2020 9:12AM
Intake Approval  3/30/2020 PASS