Permit for a 720sq’ (40x18) shotcrete swimming pool. Barrier requirements per 2015 ISPSC being satisfied with existing property fence and structure walls. All work per plans, engineering, & local code. Separate electrical permit required. **JJN** A letter from the applicant’s geotechnical engineer indicating that the pool subgrade is acceptable must be approved by Public Works prior to scheduling inspections. Please allow 24 hours for subgrade approval processing. If you have any questions call Melissa Jannusch 208-608-7168.


The final inspection of the site grading and drainage work shall be done by the design engineer. Written approval shall be submitted to Boise Public Works prior to the issuance of the building final.
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Footing7/1/20207/2/20207/2/2020APASS
DetailsTony Young
Steel inspection on rebar in pool in back yard. All plans and permits are on site and located near the future pool equipment location. If additional assistance is needed please feel free to call Monica at ###-#### Phone #: ###-#### Inspection requested via web by Monica McNair
PubWorks Subgrade Approval7/2/20207/2/20207/2/2020 DONE
DetailsJason C. Taylor
A letter from the applicant’s geotechnical engineer indicating that the pool subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Jason Taylor ###-####.
(F) Reprint permit  5/26/2020 DONE
Inspection Record Card- Bld  5/26/2020 DONE
Telephone call  5/26/2020 DONE
send permit to trowey@ppas.com
OVERRIDE  5/22/2020  
Plan assigned to (J_N)5/19/20205/19/20205/22/2020 DONE
DetailsJenny Nelson
pool
Routing - Erosion and Sediment5/19/2020 5/22/2020 PASS
DetailsMichael Zawacki
waiver approved
1st review completed  5/22/2020 DONE
DetailsJenny Nelson
Routing - PLAN CHECK5/22/2020 5/22/2020 PASS
DetailsJenny Nelson
PLANS/APPL TAKEN TO FRONT DESK  5/22/2020 DONE
DetailsJenny Nelson
Permit Ready to Issue  5/22/2020 DONE
Issue PAID IN FULL permit  5/22/2020 DONE
Plan assigned to (JAB) Josh5/8/20205/8/20205/19/2020 DEFR
DetailsJosh Bogle
05/14 pool, ePlan
Routing - PLAN CHECK5/8/2020 5/19/2020 FAIL
DetailsJenny Nelson
Barrier requirements not specified on plans
Routing PW Grading-Hillside5/8/2020 5/18/2020 PASS
DetailsMelissa Jannusch
A letter from the applicant’s geotechnical engineer indicating that the pool subgrade is acceptable must be approved by Public Works prior to scheduling inspections. Please allow 24 hours for subgrade approval processing. If you have any questions call Melissa Jannusch ###-####.


The final inspection of the site grading and drainage work shall be done by the design engineer. Written approval shall be submitted to Boise Public Works prior to the issuance of the building final.
Routing - PLANNING5/8/2020 5/15/2020 PASS
DetailsKevin Holmes
Routing - PUBLIC WORKS5/8/2020 5/8/2020 PASS
DetailsCandy A. Nichols
INGROUND SWIMMING POOL
Intake Approval  5/8/2020 PASS
Intake Approval  4/3/2020 FAIL
4/2/2020 3rd Prescreen- This is not a new process, the CFH20-00027 needs to be approved by Planning and Zoning (different department than the Building department) when that is approved and the appeal period is over you may submit this for your building permit. You may contact Planning and Zoning for questions on your CFH case and for the appeal process at ###-#### and asked to speak with someone in Planning and Zoning.

Intake Approval  4/1/2020 FAIL
Project will require a CAT II Hillside application prior to acceptance of the building permit application. Please finish CFH20-00027. Once the application has been approved by P&Z please upload the approval letter and the appeal period has passed, then this building permit case can be routed for review. Melissa Jannusch Mjannusch@cityofboise.org.
Telephone call  3/31/2020 DONE
Emailed applicant to inform them a 426 pool application should of been pulled instead of a new house 404. Asked for him to fill out a 426 application and 302 form.
Intake Approval  3/31/2020 FAIL
Need:
1. Grading and drainage plan.
2. Erosion narrative.
3. Erosion and sediment control plan. Or provide a waiver letter
4. Site plan of the whole parcel showing where the pool is located.
5.Project will require a CAT II Hillside application prior to acceptance of the building permit application. Application #114 will need to be filled out and turned in to the Planning & Zoning counter at city hall with the application fee. Once the application has been approved by P&Z please upload the approval letter and then this building permit case can be routed for approval. Melissa Jannusch ###-####.-
Application received  3/30/2020 DONE
Application submitted via PDS Online on Mar 30 2020 10:43AM