BLD-Final | 6/8/2020 | 6/9/2020 | 6/9/2020 | P | PASS |
Brandon Shaw
|
|
|
Install new wall sign reading Han''s Chimaek over enterance. Phone #: ###-#### Inspection requested via web by Ken Olsen
|
DOC - Permit Finaled | 6/9/2020 | 6/9/2020 | 6/9/2020 | P | PASS |
Brandon Shaw
|
|
|
|
Issue PAID IN FULL permit | | | 5/5/2020 | | DONE |
|
|
|
|
Plan assigned to (BJM) | 4/2/2020 | 4/2/2020 | 4/15/2020 | | DONE |
Brian McGowan
|
|
|
2nd Review Complete- CSN20-00082
|
Routing - PLAN CHECK | 4/15/2020 | | 4/15/2020 | | FAIL |
Brian McGowan
|
|
|
The same drawing was uploaded, no additional information was provided. The bolts or lags must be specified. The type of wall construction must be specified.
|
Routing - PLAN CHECK | 4/15/2020 | | 4/15/2020 | | PASS |
Brian McGowan
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 4/15/2020 | | DONE |
Brian McGowan
|
|
|
|
Permit Ready to Issue | | | 4/15/2020 | | DONE |
|
|
|
need CofO
|
Intake Approval | | | 4/10/2020 | | FAIL |
Brian McGowan
|
|
|
|
Routing - PLAN CHECK | 4/10/2020 | | 4/10/2020 | | FAIL |
Brian McGowan
|
|
|
|
1st review completed | | | 4/10/2020 | | FAIL |
Brian McGowan
|
|
|
|
Application received | | | 4/1/2020 | | DONE |
|
|
|
Application submitted via PDS Online on Apr 1 2020 11:02AM
|
First Notice | 6/9/2020 | 6/9/2020 | | | |
Brandon Shaw
|
|
|
|