Information based on query as of Thursday, July 4, 2024.
Permit Information
Permit NumberBLD20-01152
StatusIssued
Name EMPIRE CONSTRUCTION COMPANY LLC
Site Address 7008 W EL CABALLO DR
Project Name7008 El Caballo Home
Customer Number 
ePlanReviewYes
Description
**PRESCRIPTIVE ENERGY REQUIREMENT**PLAN MODIFICATION: ADDING STAND-ALONE FIREPLACE IN LIVING ROOM** Permit for the construction of a new 1520 sq. ft., one story Single Family Dwelling Unit with 3 bedrooms, 2bathrooms, approximately 288 sq. ft. of covered patio/porch and a 348 sq. ft. attached garage per the approved plans and any notations. R-1C zoning and setbacks per planning. D_S
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Wall cover6/29/20207/2/20207/2/2020PPASS
DetailsTell Riley
corrections completed.insulation completed.contact Alex with any questions. ###-#### Phone #: ###-#### Inspection requested via web by Alex Macdonald//corrections completed//Energy ok//add 2 2x8 headers for opening at hallway--Alex will send photos//
BLD-Framing/Rough-in6/25/20206/26/20206/26/2020APART
DetailsTell Riley
Truss plans onsite. Call Alex at ###-#### with any questions. Phone #: ###-#### Inspection requested via web by Alex Macdonald//CN posted for bearing wall corrections at center truss bearing//need to install FP and have inspected//ok to insulate--DO NOT INSULATE AREA WHER FP IS UNTIL IT HAS BEEN INSPECTED//
BLD-Framing/Rough-in6/17/20206/18/20206/18/2020AFAIL
DetailsTell Riley
Call Alex with any questions. ###-####. Thanks! Phone #: ###-#### Inspection requested via web by Alex Macdonald//need truss plans//air seal needs completed//add stud next to cut stud at ele panel//desinger needs to specify headers over angled windows at front and rear of home//
CHANGE STATUS TO (ISS)  6/4/2020 DONE
OVERRIDE  6/3/2020  
Plan assigned to (D_S) Debbie6/2/20206/2/20206/3/2020 DONE
DetailsDebbie Sanine
plan mod: add stand alone wood burning fireplace. Sheets A3 and A6
Routing - PLAN CHECK6/3/2020 6/3/2020 PASS
DetailsDebbie Sanine
Routing - MECHANICAL6/3/2020 6/3/2020 PASS
DetailsTroy James
plan mod adding fire place
Plan Reviewer's activity  6/3/2020 DONE
DetailsDebbie Sanine
No Building Review Plan Mod Fee to be charged
Permit Ready to Issue  6/3/2020 DONE
Plan Mod Met
Plan Modification Accepted  6/2/2020 DONE
plan mod requested by Alex Macdonald
BLD-Wall Bracing5/18/20205/19/20205/19/2020APASS
DetailsTell Riley
Please call Alex at ###-#### with any questions. Phone #: ###-#### Inspection requested via web by Alex Macdonald//ok check hold downs at PFH on framing//
BLD-Wall Bracing5/15/20205/18/20205/18/2020ANR
DetailsTell Riley
Call Alex at ###-#### with any questions! Phone #: ###-#### Inspection requested via web by Alex Macdonald
BLD-Foundation4/30/20205/1/20205/1/2020APART
DetailsTell Riley
Phone #: 2089109404 >> Inspection requested via mobile web by Ricardo //side 5' setback right on foundationn wall//front and rear ok// rebar ok per plans//discussed frost depth and drainage on 5' side, as elevation seems high//
BLD-Footing4/29/20204/30/20204/30/2020APART
DetailsTell Riley
south side, front and rear setbacks per plans//side with canal measured at center of bridge meets 15'4" on plans//rebar per plans//talked with Andy about ESC permit, notified concrete guys of washout containment, stated they would washout offsite//north side will need to comply with 2' frost depth requirements and contain water onsite--will need to be addressed by contractor//
BLD-Footing4/28/20204/29/20204/29/2020PNH
DetailsTell Riley
Phone #: 2086971241 >> Inspection requested via mobile web by Heron aggregate construct//no one oniste//will reschedule//
Issue PAID IN FULL permit  4/15/2020 DONE
Inspection Record Card- Bld  4/15/2020 DONE
OVERRIDE  4/10/2020  
Plan assigned to (D_S) Debbie4/8/20204/8/20204/10/2020 DONE
DetailsDebbie Sanine
04/22/20 sfd L1 ePlan
Routing - PLAN CHECK4/8/2020 4/10/2020 PASS
DetailsDebbie Sanine
1st review completed  4/10/2020 DONE
DetailsDebbie Sanine
PLANS/APPL TAKEN TO FRONT DESK  4/10/2020 DONE
DetailsDebbie Sanine
Permit Ready to Issue  4/10/2020 DONE
met
Route to Impact Fee Review4/8/20204/11/20204/9/2020 PASS
DetailsShannon Cade
Initial residential review of new SFD permits requested for now.
Intake Approval  4/8/2020 PASS
Routing - MECHANICAL4/8/2020 4/8/2020 PASS
DetailsTroy James
Routing - PLANNING4/8/2020 4/8/2020 PASS
DetailsSue Cummings
No canal dimensions on the plat.
Routing - Addressing4/8/2020 4/8/2020 PASS
DetailsDoug Chausow
Routing - PUBLIC WORKS4/8/2020 4/8/2020 PASS
DetailsCandy A. Nichols
CONTACT WEST BOISE DISTRICT
Intake Approval  4/6/2020 FAIL
Please provide the Manual J.
Application received  4/3/2020 DONE
Application submitted via PDS Online on Apr 3 2020 5:06PM