BLD-Final | 7/8/2020 | 7/9/2020 | 7/9/2020 | P | PASS |
Brandon Shaw
|
|
|
Phone #: ###-#### Inspection requested via web by Scott Asin
|
DOC - Permit Finaled | 7/9/2020 | 7/9/2020 | 7/9/2020 | P | PASS |
Brandon Shaw
|
|
|
|
BLD-Wall cover | 5/13/2020 | 5/14/2020 | 5/14/2020 | P | PASS |
Tony Young
|
|
|
Lock box code is 208 key is inside. Phone #: ###-#### Inspection requested via web by Scott Asin
|
BLD-Energy code compliance | 5/12/2020 | 5/13/2020 | 5/13/2020 | A | PEND |
Tony Young
|
|
|
Lock box code is 208 key is inside. Phone #: ###-#### Inspection requested via web by Scott Asin// ok pending mechanical pass
|
BLD-Framing/Rough-in | 5/7/2020 | 5/8/2020 | 5/8/2020 | P | PASS |
Dave Hannah
|
|
|
Lock box code is 208 and key is inside of the box incase the door is locked. Phone #: ###-#### Inspection requested via web by Scott Asin
|
Plan assigned to (JAB) Josh | 4/16/2020 | 4/16/2020 | 5/1/2020 | | PASS |
Josh Bogle
|
|
|
04/22 garage conversion, ePlan - 1st done
|
Routing - PLAN CHECK | 5/1/2020 | | 5/1/2020 | | PASS |
Josh Bogle
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 5/1/2020 | | DONE |
Josh Bogle
|
|
|
ESC no - Energy yes
|
Permit Ready to Issue | | | 5/1/2020 | | DONE |
|
|
|
MET
|
Issue PAID IN FULL permit | | | 5/1/2020 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 5/1/2020 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 4/16/2020 | | 4/29/2020 | | FAIL |
Josh Bogle
|
|
|
see notes in ePlan
|
1st review completed | | | 4/29/2020 | | FAIL |
Josh Bogle
|
|
|
|
Intake Approval | | | 4/16/2020 | | PASS |
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 4/16/2020 | | DONE |
|
|
|
|
Intake Approval | | | 4/14/2020 | | FAIL |
|
|
|
Prescreen Comments:
1. Show before and after floorplan
2. Indicate where new Mini-Split system is going to be. Upload Mini split manufacturer documents.
3. Please include a reduced site plan of entire parcel
|
Application received | | | 4/13/2020 | | DONE |
|
|
|
Application submitted via PDS Online on Apr 13 2020 10:21AM
|