BLD-Energy code compliance | 7/20/2020 | 7/21/2020 | 7/21/2020 | A | PASS |
Tell Riley
|
|
|
Phone #: ###-#### Inspection requested via web by Christian Mikesell//bath window will need to be safety glazed prior to final//Smoke/co combo will need to be outside bedroom to meet code requirements--all smoke and smoke/CO combo detectors will need to be interconnected and in proper locations for code compliance//
|
BLD-Framing/Rough-in | 7/16/2020 | 7/16/2020 | 7/16/2020 | A | PASS |
Brandon Shaw
|
|
|
OK to insulate...
|
BLD-Wall Bracing | 6/24/2020 | 6/24/2020 | 6/24/2020 | P | PASS |
Tell Riley
|
|
|
Phone #: ###-#### Inspection requested via web by Christian Mikesell
|
BLD-Foundation | 6/4/2020 | 6/4/2020 | 6/4/2020 | P | PASS |
Tell Riley
|
|
|
early pm - stem wall - screened // Christian Phone #: 5###-####
|
CHANGE STATUS TO (ISS) | | | 6/4/2020 | | DONE |
|
|
|
|
Plan assigned to (JAB) Josh | 5/29/2020 | 5/29/2020 | 6/3/2020 | | PASS |
Josh Bogle
|
|
|
Plan Mod
|
Routing - PLAN CHECK | 6/1/2020 | | 6/3/2020 | | PASS |
Josh Bogle
|
|
|
1hr PR fee
|
Permit Ready to Issue | | | 6/3/2020 | | DONE |
|
|
|
**DO NOT REISSUE - PLAN MOD**
|
Routing - PLANNING | 6/1/2020 | | 6/1/2020 | | PASS |
Sue Cummings
|
|
|
|
Plan Modification Accepted | | | 5/29/2020 | | DONE |
|
|
|
Changing to 12X16 footings, route to JAB
|
BLD-Footing | 5/27/2020 | 5/28/2020 | 5/28/2020 | A | PEND |
Tell Riley
|
|
|
Plans are in red cooler just outside dig area on grass Phone #: ###-#### Inspection requested via web by Christian Mikesell//footings ok per plan/bar added//need plan modification for 16 feet wide, plans show 15' wide//let contractor know, continue at own risk until plan mod approved//
|
BLD-Footing | 5/23/2020 | 5/26/2020 | 5/26/2020 | A | NR |
Tell Riley
|
|
|
Phone #: ###-#### Inspection requested via web by Christian Mikesell//need approved plans onsite for isnpection//let Christian know and he will re-schedule//
|
Issue PAID IN FULL permit | | | 5/11/2020 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 5/11/2020 | | DONE |
|
|
|
|
Plan assigned to (JAB) Josh | 4/15/2020 | 4/15/2020 | 4/24/2020 | | PASS |
Josh Bogle
|
|
|
04/21 addition, ePlan
|
Routing - PLAN CHECK | 4/15/2020 | | 4/24/2020 | | PASS |
Josh Bogle
|
|
|
|
1st review completed | | | 4/24/2020 | | DONE |
Josh Bogle
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 4/24/2020 | | DONE |
Josh Bogle
|
|
|
ESC no - Energy yes
|
Permit Ready to Issue | | | 4/24/2020 | | DONE |
|
|
|
|
Routing - PLANNING | 4/15/2020 | | 4/15/2020 | | PASS |
Jeff Lowe
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 4/15/2020 | | DONE |
|
|
|
|
Intake Approval | | | 4/15/2020 | | PASS |
|
|
|
|
Intake Approval | | | 4/14/2020 | | FAIL |
|
|
|
Please have each drawings as an individual file with files names that state what is on the page. (example: A1 Site Plan or Site Plan)
|
Application received | | | 4/13/2020 | | DONE |
|
|
|
Application submitted via PDS Online on Apr 13 2020 7:37PM
|
Routing - PLANNING | 6/1/2020 | | | | |
Jeff Lowe
|
|
|
|