BLD-Conference | 7/30/2020 | 7/30/2020 | 7/30/2020 | P | DONE |
Brandon Shaw
|
|
|
Screened- Kenvi Phone #: ###-####
|
BLD-Conference | 7/17/2020 | 7/17/2020 | 7/17/2020 | P | DONE |
Tell Riley
|
|
|
Kevin - */Conference please call*/ Phone #: ###-####
|
CHANGE STATUS TO (ISS) | | | 7/17/2020 | | DONE |
|
|
|
|
OVERRIDE | | | 7/16/2020 | | |
|
|
|
|
Permit Ready to Issue | | | 7/16/2020 | | DONE |
|
|
|
Plan Mod Met
|
BLD-Concrete | 7/10/2020 | 7/13/2020 | 7/13/2020 | A | PASS |
Tony Young
|
|
|
Stem wall- Dustin *screened* Phone #: ###-####
|
Routing - PLAN CHECK | 7/13/2020 | | 7/13/2020 | | PASS |
Josh Bogle
|
|
|
MODIFICATION - 1 hour min. fee
|
BLD-Footing | 7/2/2020 | 7/6/2020 | 7/6/2020 | A | PART |
Tell Riley
|
|
|
Dustin *screened* Phone #: ###-####//WIP//will need to sleeve waste line through footer//
|
Issue PAID IN FULL permit | | | 6/15/2020 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 6/15/2020 | | DONE |
|
|
|
|
Telephone call | | | 5/7/2020 | | DONE |
|
|
|
Emailed the parcel owner to inform them the erosion fee was missed and that once that fee is paid we can issue the permits.
|
OVERRIDE | | | 5/4/2020 | | |
|
|
|
|
Plan assigned to (JAB) Josh | 4/16/2020 | 4/16/2020 | 5/4/2020 | | PASS |
Josh Bogle
|
|
|
04/22 addition, ePlan - 1st done
|
Plan Reviewer's activity | | | 5/4/2020 | | DONE |
Josh Bogle
|
|
|
accpeted and routed resubmittal
|
Routing - PLANNING | 5/4/2020 | | 5/4/2020 | | PASS |
Jeff Lowe
|
|
|
per cva20-00010
|
Routing - PLAN CHECK | 5/4/2020 | | 5/4/2020 | | PASS |
Josh Bogle
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 5/4/2020 | | DONE |
Josh Bogle
|
|
|
ESC yes - Energy yes
|
Permit Ready to Issue | | | 5/4/2020 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 4/16/2020 | | 4/29/2020 | | FAIL |
Josh Bogle
|
|
|
see e-mail to Kevin
|
1st review completed | | | 4/29/2020 | | FAIL |
Josh Bogle
|
|
|
|
Routing - PLANNING | 4/16/2020 | | 4/16/2020 | | FAIL |
Jeff Lowe
|
|
|
plans need to show demolition of existing kitchen. only one kitchen allowed.
|
Intake Approval | | | 4/16/2020 | | FAIL |
|
|
|
per conversation with applicant - submission in complete - please upload the rest of the drawings.
|
Intake Approval | | | 4/16/2020 | | PASS |
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 4/16/2020 | | DONE |
|
|
|
|
Application received | | | 4/14/2020 | | DONE |
|
|
|
Application submitted via PDS Online on Apr 14 2020 8:53PM
|