BLD-Energy code compliance | 8/4/2020 | 8/5/2020 | 8/5/2020 | P | PASS |
Brandon Shaw
|
|
|
ok with video/photo /// Daniel Phone #: ###-####
|
BLD-Framing/Rough-in | 7/27/2020 | 7/28/2020 | 7/28/2020 | A | PASS |
Brandon Shaw
|
|
|
SCREENED // Daniel Phone #: ###-####
|
Routing - PLANNING | 7/16/2020 | | 7/17/2020 | | PASS |
Sue Cummings
|
|
|
|
Plan Modification Accepted | | | 7/15/2020 | | DONE |
|
|
|
Added a deck
|
BLD-Framing/Rough-in | 7/6/2020 | 7/6/2020 | 7/6/2020 | P | NR |
Brandon Shaw
|
|
|
No city approved plans...
|
BLD-Wall Bracing | 6/18/2020 | 6/18/2020 | 6/18/2020 | P | PEND |
Brandon Shaw
|
|
|
1st floor only... Provide city approved plans...
|
BLD-Footing | 5/8/2020 | 5/14/2020 | 5/14/2020 | P | PEND |
Brandon Shaw
|
|
|
Submit change to foundation, from slab on grade to footing and foundation walls with floor truss system...
|
Place hold on job | 5/11/2020 | | 5/14/2020 | | DONE |
Tiffany Carson-Herker
|
|
|
Waiting for signed permit
|
Telephone call | | | 5/11/2020 | | DONE |
|
|
|
Emailed the parcel owner to remind them to please sign the permits and email them back, so we can release the approved plans.
|
Issue PAID IN FULL permit | | | 5/8/2020 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 5/8/2020 | | DONE |
|
|
|
|
Plan assigned to (JAB) Josh | 4/21/2020 | 4/21/2020 | 5/7/2020 | | PASS |
Josh Bogle
|
|
|
04/27 addition, ePlan - 1st done
|
Routing - PLAN CHECK | 5/7/2020 | | 5/7/2020 | | PASS |
Josh Bogle
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 5/7/2020 | | DONE |
Josh Bogle
|
|
|
ESC yes - Energy yes
|
Permit Ready to Issue | | | 5/7/2020 | | DONE |
|
|
|
|
1st review completed | | | 5/6/2020 | | FAIL |
Josh Bogle
|
|
|
|
Routing - PLAN CHECK | 4/21/2020 | | 5/6/2020 | | FAIL |
Josh Bogle
|
|
|
no attic access
|
Routing - PLANNING | 4/21/2020 | | 4/21/2020 | | PASS |
Sue Cummings
|
|
|
Has pull down stair for access to above
|
Intake Approval | | | 4/21/2020 | | PASS |
|
|
|
|
Intake Approval | | | 4/16/2020 | | FAIL |
|
|
|
Please provide a full floor plan of the exiting floor with the new and please upload the drawings into the drawings folder. thank you
|
Application received | | | 4/15/2020 | | DONE |
|
|
|
Application submitted via PDS Online on Apr 15 2020 3:20PM
|
Plan assigned to (JAB) Josh | 7/16/2020 | 7/16/2020 | | | |
Josh Bogle
|
|
|
07/22 deck - under review by JAB, waiting for engineering
|
Routing - PLAN CHECK | 7/16/2020 | | | | |
Josh Bogle
|
|
|
|