Permit Information
Permit NumberBLD20-01276
StatusIssued
Name GEM GUNITE POOLS
Site Address 12000 W FAIRVIEW AVE
Project NameThe Village East Appartments
Customer Number 
ePlanReviewYes
Description
(VILLAGE EAST APARTMENTS POOL) Permit for the installation of a new in-ground gunite swimming pool and raised spa adjacent to the club house building permitted under BLD19-00536. THIS PERMIT IS FOR THE POOL AND POOL DECK ONLY. The total area of the fenced enclosure is 9,414 sq ft (BBQ and covered patio part of clubhouse original permit). The water surface area of the swimming pool is about 2,534 sq. ft. and the pool perimeter will be about 249 ft, and 61,000 gallons of water. The water surface of the spa is about 144 sq. ft. and the spa perimeter will be about 56 ft, and 3,300 gallons of water. Work to include: Reinforced concrete swimming pool (pool walls and floor), two concrete stairways to serve the pool, a pool ladder, handrails, a pool lift accessible to the disabled; concrete spa (walls and floor) with transfer wall accessible to the disabled; pool equipment; and the perimeter fence barrier. Pool gates are required to have illuminated exit signs and panic hardware. Pool barrier to meet requirements of 2015 ISPSC Section 305. Special Inspection required for concrete. **JJN**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Other7/23/20207/24/20207/24/2020PPASS
DetailsBrandon Shaw
*Screened* Rebar - Justin Phone #: ###-####
Issue PAID IN FULL permit  7/23/2020 DONE
Print Occupancy Form  7/23/2020 DONE
Telephone call  7/21/2020 DONE
emailed justin@idahopools.com about rp and fees
OVERRIDE  7/17/2020  
Plan assigned to (J_N)7/1/20207/1/20207/17/2020 DONE
DetailsJenny Nelson
1st complete 06/22/20 (L-3 - 15 days) (eplan - 21 sheets) Village East Apartments Pool. Reassigned to Jenny from Carl Westfall's List on 7/1/20.
Routing - PLAN CHECK7/17/2020 7/17/2020 PASS
DetailsJenny Nelson
PLANS/APPL TAKEN TO FRONT DESK  7/17/2020 DONE
DetailsJenny Nelson
Permit Ready to Issue  7/17/2020 DONE
met
Need
RP
Routing - FIRE7/14/20207/14/20207/16/2020 PASS
DetailsGreg Ruxton
Attached comments to case.
Routing - PLAN CHECK7/14/2020 7/15/2020 FAIL
DetailsJenny Nelson
Routing - FIRE7/7/20207/7/20207/14/2020 FAIL
DetailsGreg Ruxton
Attached comments to case and emailed architect.
Routing - PLAN CHECK7/7/2020 7/8/2020 FAIL
DetailsJenny Nelson
No building corrections
1st review completed  7/2/2020 DONE
DetailsJenny Nelson
Routing - PLAN CHECK6/4/2020 7/2/2020 FAIL
DetailsJenny Nelson
Plan assigned to (CJW)6/4/20206/29/20207/1/2020 DEFR
DetailsCarl Westfall
9 - 06/22/20 (L-3 - 15 days) (eplan - 21 sheets) Village East Apartments Pool - Reassigned to Jenny Nelson on 7/1/20.
Routing PW Environmental6/11/2020 7/1/2020 PASS
Details
Passed in ePlan by Zach Conde
Routing - FIRE6/4/20206/4/20206/17/2020 FAIL
DetailsGreg Ruxton
Attached comments to case and emailed architect.
Routing PW Drainage6/11/2020 6/17/2020 PASS
DetailsBrian Murphy
Routing - PUBLIC WORKS6/4/2020 6/11/2020 PASS
DetailsMorgan Webb
Routing - PLANNING6/4/2020 6/8/2020 PASS
DetailsLeon Letson
parking pad must be a miniium of 20' from front setback and 15' from street side setback.
Routing - Addressing6/4/2020 6/8/2020 PASS
DetailsDoug Chausow
Routing - Erosion and Sediment6/4/2020 6/5/2020 PASS
DetailsMichael Zawacki
Will inspect pool while on site. Pool does need its own permit.
No RP required, prime contractor always on site.
Routing - Design Review6/4/2020 6/5/2020 PASS
DetailsJosh Wilson
Routing - MECHANICAL6/4/2020 6/5/2020 PASS
DetailsTroy James
Field verify pool heaters installation per manufacturer and IMC.
Routing - PLUMBING6/4/2020 6/5/2020 PASS
DetailsDaryl Spivey
Plumbing plan for clubhouse only. Pool not reviewed on this plan.
Intake Approval  6/2/2020 PASS
Intake Approval  5/26/2020 FAIL
DetailsJenny Nelson
1. ESC plan indicated on submittal checklist as being provided, do not see in plan sheets, please upload.
2. No cover sheet G.01 provided as indicated on submittal checklist, please upload. Also please make sure code analysis is provided - do not see on Sheet PL-0.1
3. Per submittal checklist provide list of chemicals and amounts that will be stored for pool - indicated as provided but do not see included in plans or documents
4. Per submittal checklist plumbing plans must be stamped by Idaho licensed plumbing engineer. Or provide approval from plumbing plan reviewer that stamp not required - can email Dan Ediger at dediger@cityofboise.org to request approval to submit without stamp.
5. Shotcrete is specified on engineering plans - may required special inspections - please have engineer fill out #310 Special Inspections form. Can be found here: https://www.cityofboise.org/media/9063/final310_special_inspections_01-2019.pdf
6. Please make sure stamping area is provided in bottom right corner for city stamp on all plan sheets - cover sheet shall have 4"x4" area 3" off the right edge; and all other sheets shall have 4"x2" area 3" off right edge reserved.
Intake Approval  4/27/2020 FAIL
DetailsJenny Nelson
To complete this application please provide the following:
1. Please upload completed submittal checklist, it may be found on the city website here: https://www.cityofboise.org/departments/planning-and-development-services/building/building-permits/commercial-construction-500/538-commercial-swimming-pool-and-spa-in-ground/
2. Provide all required documents per the submittal checklist
3. Please provide stamping area at bottom right corner on all plan sheets.
Application received  4/16/2020 DONE
Application submitted via PDS Online on Apr 16 2020 2:51PM