Information based on query as of Wednesday, July 24, 2024.
Permit Information
Permit NumberBLD20-01282
StatusIssued
Name COOK BROTHERS CONSTRUCTION
Site Address 4421 W RIM ST
Project Name4421 Rim Street
Customer Number 
ePlanReviewYes
Description
MODIFICATION- GARAGE NOW ONLY 335sq', THE OTHER PART IS A 435sq' FAMILY ROOM. Permit for an addition/remodel that adds a 770sq' attached garage and reconfgures much of the existing floor plan. Final home is 3bd/2bth. All work per plans, notations, engineering, local codes & ordinances. Separate electrical, plumbing & mechanical permits required. **JAB**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Footing7/15/20207/16/20207/16/2020APASS
DetailsBrandon Shaw
Pat - */Screened*/ Phone #: ###-####
BLD-Footing7/14/20207/15/20207/15/2020PPART
DetailsTell Riley
screened - nobody is living here // Pat Phone #: ###-####//need to double check setbacks on wall inspection//they will have strings pulled for verification//rebar installed per plans///
BLD-Footing7/13/20207/14/20207/14/2020PNR
DetailsJim Storey
Chris Phone #: ###-####
CHANGE STATUS TO (ISS)  6/25/2020 DONE
OVERRIDE  6/24/2020  
Plan assigned to (JAB) Josh6/8/20206/8/20206/24/2020 PASS
DetailsJosh Bogle
plan mod- plan mod fee sheet uploaded in eplan
Routing - PLAN CHECK6/24/2020 6/24/2020 PASS
DetailsJosh Bogle
fee per added value
Permit Ready to Issue  6/24/2020 DONE
plan mod approved.
DO NOT RE ISSUE
Routing - PLAN CHECK6/12/2020 6/12/2020 FAIL
DetailsJosh Bogle
engineering needs updated
Routing - PLAN CHECK6/11/2020 6/11/2020 FAIL
DetailsJosh Bogle
no review pending Planning approval
Routing - PLANNING6/11/2020 6/11/2020 PASS
DetailsSue Cummings
Compliant parking at rear of house.(double fronted)
Routing - PLANNING6/9/2020 6/10/2020 FAIL
DetailsSue Cummings
plan mod- change dimension to garage. This change eliminates compliant parking in the front
BLD-Footing6/5/20206/8/20206/8/2020PCANC
DetailsDave Hannah
Change from AM to PM Pat ###-####
Plan Modification Accepted  6/8/2020 DONE
Mike Cook requested plan mod to change dimensions of garage
BLD-Footing6/5/20206/5/20206/5/2020PFAIL
DetailsTell Riley
Pat Phone #: ###-####//west side setback measures 4'-plans show 5'//talked with Sue at zoning 5' setback on new constrution needs to be maintained//will provide change to plan review//
Issue PAID IN FULL permit  5/28/2020 DONE
Inspection Record Card- Bld  5/28/2020 DONE
Telephone call  5/28/2020 DONE
email permits and inspection card to- rcook@cookbrosusa.com and mcook@cookbrosusa.com
OVERRIDE  5/14/2020  
Plan assigned to (JAB) Josh4/17/20204/17/20205/14/2020 PASS
DetailsJosh Bogle
04/23 addition, ePlan - 1st done
Routing - PLAN CHECK5/14/2020 5/14/2020 FAIL
DetailsJosh Bogle
see notes in ePlan
Routing - PLAN CHECK5/14/2020 5/14/2020 PASS
DetailsJosh Bogle
PLANS/APPL TAKEN TO FRONT DESK  5/14/2020 DONE
DetailsJosh Bogle
ESC yes - Energy yes
Permit Ready to Issue  5/14/2020 DONE
met
Routing - PLAN CHECK5/13/2020 5/13/2020 FAIL
DetailsJosh Bogle
no review pending Planning approval
Routing - PLANNING5/13/2020 5/13/2020 PASS
DetailsSue Cummings
The garage addition is in the front. He had to explain because the site plan didn't have a north arrow or street lable.
Routing - PLAN CHECK5/13/2020 5/13/2020 FAIL
DetailsJosh Bogle
see notes in ePlan
Plan Reviewer's activity  5/12/2020 DONE
DetailsJosh Bogle
accepted and routed resubmittal
Routing - PLAN CHECK5/11/2020 5/11/2020 FAIL
DetailsJosh Bogle
no review pending Planning approval
Routing - PLANNING5/4/2020 5/4/2020 FAIL
DetailsSue Cummings
Need to show the driveway on the site plan.
Routing - PLAN CHECK5/4/2020 5/4/2020 PASS
DetailsJosh Bogle
no review pending Planning approval
Plan Reviewer's activity  5/1/2020 DONE
DetailsJosh Bogle
accepted and routed resubmittal
Routing - MECHANICAL4/30/2020 4/30/2020 PASS
DetailsTroy James
1st review completed  4/30/2020 FAIL
DetailsJosh Bogle
Routing - PLAN CHECK4/17/2020 4/30/2020 FAIL
DetailsJosh Bogle
see notes in ePlan
Application received  4/17/2020 DONE
Application submitted via PDS Online on Apr 17 2020 12:11PM
Intake Approval  4/17/2020 PASS
Routing - PLANNING4/17/2020 4/17/2020 FAIL
DetailsSue Cummings
parking needs to be a minimum of 18 ft. widw and and paved.