Letter of compliance/Occupancy | | | 8/4/2020 | | DONE |
|
|
|
|
BLD-Final | 7/29/2020 | 7/30/2020 | 7/30/2020 | P | PASS |
Tell Riley
|
|
|
Bridger *screened* Phone #: ###-####//final is complete//
|
FIRE-Final Inspection | 7/29/2020 | 7/30/2020 | 7/30/2020 | A | PASS |
Troy Cobbley
|
|
|
Life safety passed.
Bridger *screened* Phone #: ###-####
|
DOC - Permit Finaled | | | 7/30/2020 | | DONE |
|
|
|
final inspection was completed 7-30-2020 and permit is not for occupancy
|
BLD-Ceiling Grid Inspection | 7/21/2020 | 7/22/2020 | 7/23/2020 | A | PASS |
Tell Riley
|
|
|
Bridger ###-####//grid ok per the plans//
|
BLD-Ceiling Grid Inspection | 7/20/2020 | 7/21/2020 | 7/21/2020 | P | NR |
Tell Riley
|
|
|
workers came in from out of state in the last few days // late afternoon if possible ..... Bridger Phone #: ###-####//need fire sprinkler and electrical--they are scheduled for tomorrow am//tis inspection has also been rescheduled//
|
BLD-Framing/Rough-in | 6/30/2020 | 7/1/2020 | 7/1/2020 | A | PART |
Tell Riley
|
|
|
screened // Shawn Phone #: ###-####//framing in areas that do not have plumbing ok, shawn will send photos of headers and jambs when installed//electrical rough approved//brace wall at office with 45 degree bracing//
|
Issue PAID IN FULL permit | | | 6/25/2020 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 6/25/2020 | | DONE |
|
|
|
|
Plan assigned to (J_N) | 4/28/2020 | 4/28/2020 | 5/20/2020 | | DONE |
Jenny Nelson
|
|
|
1st complete 05/01 L1 AFCU Boise Branch ePlan
|
Routing - PLAN CHECK | 5/20/2020 | | 5/20/2020 | | PASS |
Jenny Nelson
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 5/20/2020 | | DONE |
Jenny Nelson
|
|
|
|
Permit Ready to Issue | | | 5/20/2020 | | DONE |
|
|
|
MET GC acoffin@wadman.com and twilson@wadman.com and sconroy@wadman.com
MET Rev Values
|
Route to Impact Fee Review | 5/4/2020 | 5/7/2020 | 5/6/2020 | | PASS |
Shannon Cade
|
|
|
Review requested for Commercial Permit
|
Routing - PLAN CHECK | 4/28/2020 | | 5/4/2020 | | FAIL |
Jenny Nelson
|
|
|
Need door hardware information
|
1st review completed | | | 5/4/2020 | | DONE |
Jenny Nelson
|
|
|
|
Routing - Addressing | 4/28/2020 | | 4/29/2020 | | PASS |
Doug Chausow
|
|
|
|
Routing - PUBLIC WORKS | 4/28/2020 | | 4/29/2020 | | PASS |
Morgan Webb
|
|
|
NO NEW FEES
|
Intake Approval | | | 4/27/2020 | | PASS |
Javier Guzman
|
|
|
|
Intake Approval | | | 4/21/2020 | | FAIL |
Javier Guzman
|
|
|
For prescreen review provide and upload the following:
• Per ePlan submittal standards the plans are required to be uploaded individually not as a packet. See ePlan submittal standards for naming each sheet at https://www.cityofboise.org/media/7025/electronic_submittal_standards.pdf
• Per ePlan submittal standards the reserve the bottom right corner on the drawing plans for the City electronic stamps. Leave a blank 4” x 2” space located 3” off the right sheet edge to allow for the title block on plan sheet A4.2, EE.01, ED1.1, ED1.2, EE1.1, EE1.2 see ePlan standards at https://www.cityofboise.org/media/7025/electronic_submittal_standards.pdf
|
Application received | | | 4/17/2020 | | DONE |
|
|
|
Application submitted via PDS Online on Apr 17 2020 5:20PM
|