BLD-Conference | 6/8/2020 | 6/8/2020 | 6/8/2020 | P | DONE |
Mike Jordan
|
|
|
Steve Phone #: ###-####
|
Telephone call | | | 6/1/2020 | | DONE |
|
|
|
Emailed parcel owner to inform them that not all fees were paid for this project. Once the remaining fees are paid we can issue the permits.
|
Issue PAID IN FULL permit | | | 6/1/2020 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 6/1/2020 | | DONE |
|
|
|
|
OVERRIDE | | | 5/29/2020 | | |
|
|
|
|
Permit Ready to Issue | | | 5/29/2020 | | DONE |
|
|
|
parcel owner acting as RP
MET
Need RP
|
Plan assigned to (JAB) Josh | 4/22/2020 | 4/22/2020 | 5/28/2020 | | PASS |
Josh Bogle
|
|
|
04/27 shop, ePlan - 1st done
|
Routing - PLANNING | 5/28/2020 | | 5/28/2020 | | PASS |
Crystal Rain
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 5/28/2020 | | DONE |
Josh Bogle
|
|
|
ESC yes - Energy no
|
Routing - PLAN CHECK | 5/27/2020 | | 5/27/2020 | | PASS |
Josh Bogle
|
|
|
|
Routing Walk-In (Zoning) | 4/30/2020 | 4/30/2020 | 4/30/2020 | P | FAIL |
Sue Cummings
|
|
|
Need to wait untill the CZC actually gets approved
|
Plan Reviewer's activity | | | 4/30/2020 | | DONE |
Josh Bogle
|
|
|
rejected resubmittal - called Steve to chat about process
|
1st review completed | | | 4/23/2020 | | DONE |
Josh Bogle
|
|
|
|
Routing - PLAN CHECK | 4/22/2020 | | 4/23/2020 | | PASS |
Josh Bogle
|
|
|
no review pending Planning approval
|
Routing - PLANNING | 4/22/2020 | | 4/22/2020 | | FAIL |
Sue Cummings
|
|
|
Shop > 1,000 s.f. requires zoning certificate approval by Planning prior to obtaining building permit
|
Intake Approval | | | 4/22/2020 | | PASS |
|
|
|
|
Intake Approval | | | 4/21/2020 | | FAIL |
|
|
|
Files must be uploaded as .pdf and be legible. Please see ePlan submittal standards at: https://www.cityofboise.org/media/7025/electronic_submittal_standards.pdf
|
Intake Approval | | | 4/21/2020 | | FAIL |
|
|
|
Prescreen 2:
All pages must be uploaded individually and with sheet names pertaining to what is on the page.
|
Intake Approval | | | 4/21/2020 | | FAIL |
|
|
|
Prescreen 3:
Corrections below not completed. If having trouble please call ###-#### or email permits@cityofboise.org.
Drawings must be uploaded as individual files. Please separate the sheets in the packet and upload as individual files. ex. DWG_Cover Page 1, DWG_Foundation Plan 2
|
Application received | | | 4/20/2020 | | DONE |
|
|
|
Application submitted via PDS Online on Apr 20 2020 12:03PM
|