BLD-Energy code compliance | 8/6/2020 | 8/6/2020 | 8/6/2020 | P | PASS |
Mike Jordan
|
|
|
Phone #: ###-#### Inspection requested via web by Rustin Ray
|
BLD-Framing/Rough-in | 8/5/2020 | 8/5/2020 | 8/5/2020 | P | PASS |
Mike Jordan
|
|
|
Phone #: ###-#### Inspection requested via web by Rustin Ray
|
Routing - MECHANICAL | 8/4/2020 | | 8/4/2020 | | PASS |
Troy James
|
|
|
New manual j report
|
BLD-Wall Bracing | 7/20/2020 | 7/20/2020 | 7/20/2020 | A | PART |
Mike Jordan
|
|
|
Phone #: ###-#### Inspection requested via web by Rustin Ray. Ok to cover exterior with tyvek. Needs to complete the trussed braced frame and nail exterior per the W# wall type. Will verify this on framing inspection.
|
BLD-Wall Bracing | 7/15/2020 | 7/15/2020 | 7/15/2020 | P | FAIL |
Mike Jordan
|
|
|
Phone #: ###-#### Inspection requested via web by Rustin Ray
|
BLD-Foundation | 6/10/2020 | 6/10/2020 | 6/10/2020 | A | PART |
Mike Jordan
|
|
|
Ready for 8 am inspection Phone #: ###-#### Inspection requested via web by Jay Jones
|
BLD-Footing | 6/7/2020 | 6/8/2020 | 6/8/2020 | A | PASS |
Mike Jordan
|
|
|
9:30 am Phone #: ###-#### Inspection requested via web by Jay Jones
|
Issue PAID IN FULL permit | | | 6/1/2020 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 6/1/2020 | | DONE |
|
|
|
|
OVERRIDE | | | 5/20/2020 | | |
|
|
|
|
Plan assigned to (RDP) | 4/21/2020 | 4/21/2020 | 5/20/2020 | | DONE |
Rob Patrick
|
|
|
Resubmit 05/25: 2nd Review Complete 05/18; Bldg Review is ready to Pass pending Planning Comments being corrected. 05/04 sfd L1 ePlan
|
Routing - PLAN CHECK | 5/20/2020 | | 5/20/2020 | | PASS |
Rob Patrick
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 5/20/2020 | | DONE |
Rob Patrick
|
|
|
|
Permit Ready to Issue | | | 5/20/2020 | | DONE |
|
|
|
met
|
Routing - PLAN CHECK | 5/18/2020 | | 5/18/2020 | | FAIL |
Rob Patrick
|
|
|
Planning has Corrections req'd. Building review complete and ready to release.
|
Routing - PLANNING | 5/18/2020 | | 5/18/2020 | | PASS |
Jeff Lowe
|
|
|
plans now comply
|
Routing - PLANNING | 5/15/2020 | | 5/15/2020 | | FAIL |
Jeff Lowe
|
|
|
covered patio extends into rear setback. posts must be at 30-foot setback or decrease patio cover to 250SF or less and 15-foot tall maximum.
|
1st review completed | | | 5/8/2020 | | FAIL |
Rob Patrick
|
|
|
Failed for Planning Comments. Bldg Review is good to go.
|
Routing - PLAN CHECK | 4/21/2020 | | 5/8/2020 | | FAIL |
Rob Patrick
|
|
|
Failed for Planning Comments. Bldg Review is complete and good to go.
|
Routing - FIRE | 4/22/2020 | 4/22/2020 | 4/23/2020 | | PASS |
Lee G Meredith
|
|
|
New SFH
Sprinklers are not required. The driveway is shared with the adjacent lot for a total width of 30 feet. All other measurements are within acceptable limits. No written review comments.
|
Route to Impact Fee Review | 4/21/2020 | 4/24/2020 | 4/22/2020 | | PASS |
Shannon Cade
|
|
|
Initial residential review of new SFD permits requested for now.
|
Plan Reviewer's activity | | | 4/22/2020 | | DONE |
|
|
|
Emailed Rusting to let him know that I will need a release of liability for the driveway. Also need to know that the driveway is still shared with the adjacent property at 2681 S. Simsbury.
since the property exceeds 3600 sq. ft., I will need a new fire flow report that indicates a minimum of 1,750 GPM or an acceptable flow for a limited duration.
|
Routing - MECHANICAL | 4/21/2020 | | 4/22/2020 | | PASS |
Troy James
|
|
|
|
Routing - PLANNING | 4/21/2020 | | 4/22/2020 | | FAIL |
Jeff Lowe
|
|
|
driveway width, setback from common driveway, patio cover extending into setbacks
|
Routing - Addressing | 4/21/2020 | | 4/22/2020 | | PASS |
Doug Chausow
|
|
|
|
Routing - PUBLIC WORKS | 4/21/2020 | | 4/22/2020 | | PASS |
Morgan Webb
|
|
|
|
Application received | | | 4/21/2020 | | DONE |
|
|
|
Application submitted via PDS Online on Apr 21 2020 11:29AM
|
Plans ACCEPTED BY PLAN TECH | | | 4/21/2020 | | DONE |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 4/21/2020 | | DONE |
|
|
|
|
Intake Approval | | | 4/21/2020 | | PASS |
|
|
|
|