BLD-Wall Bracing | 8/11/2020 | 8/12/2020 | 8/12/2020 | A | PASS |
Brandon Shaw
|
|
|
Thanks Phone #: ###-#### Inspection requested via web by bryan murdoch
|
BLD-Foundation | 6/5/2020 | 6/8/2020 | 6/8/2020 | P | PASS |
Brandon Shaw
|
|
|
We will want to pour at 3. If you could be there around 1:30 would be great. Thanks Eric ###-#### Phone #: ###-#### Inspection requested via web by bryan murdoch
|
BLD-Footing | 5/29/2020 | 6/1/2020 | 6/1/2020 | A | PASS |
Brandon Shaw
|
|
|
Work in progress...
|
PubWorks Subgrade Approval | 5/21/2020 | 5/21/2020 | 5/21/2020 | | DONE |
Melissa Jannusch
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Melissa Jannusch ###-####.
|
Issue PAID IN FULL permit | | | 5/20/2020 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 5/20/2020 | | DONE |
|
|
|
|
OVERRIDE | | | 5/19/2020 | | |
|
|
|
|
Plan assigned to (D_S) Debbie | 4/24/2020 | 4/24/2020 | 5/19/2020 | | DONE |
Debbie Sanine
|
|
|
|
Routing - PLAN CHECK | 5/19/2020 | | 5/19/2020 | | PASS |
Debbie Sanine
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 5/19/2020 | | DONE |
Debbie Sanine
|
|
|
|
Permit Ready to Issue | | | 5/19/2020 | | DONE |
|
|
|
|
1st review completed | | | 5/19/2020 | | DONE |
|
|
|
|
Routing PW Grading-Hillside | 4/24/2020 | | 5/8/2020 | | PASS |
Melissa Jannusch
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Please e-mail the stamped inspection approval letter to mjannusch@cityofboise.org and allow 24 hours for subgrade approval processing. Call Melissa Jannusch at ###-#### with questions.
The final inspection of the site grading and drainage work shall be done by the design engineer. Written approval shall be submitted to Boise Public Works prior to the issuance of the building final.
Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Melissa Jannusch at ###-####.
|
Routing - PLANNING | 4/29/2020 | | 4/29/2020 | | PASS |
Ethan Mansfield
|
|
|
|
Routing - Erosion and Sediment | 4/24/2020 | | 4/29/2020 | | PASS |
Andy J. Long
|
|
|
If ESC permit ESC20-00591 is issued already, please VOID this permit. No duplicate ESC permit required at this site.
if not....
ESC plan approved. Certified RP listed. Site preparation inspection is required.
|
Route to Impact Fee Review | 4/24/2020 | 4/27/2020 | 4/27/2020 | | PASS |
Shannon Cade
|
|
|
Initial residential review of new SFD permits requested for now.
|
Routing - FIRE | 4/24/2020 | 4/24/2020 | 4/27/2020 | | PASS |
Lee G Meredith
|
|
|
New SFH
Bryan Murdoch indicated in an email that a fire sprinkler system will be provided. No review comments provided.
|
Routing - MECHANICAL | 4/24/2020 | | 4/27/2020 | | PASS |
Troy James
|
|
|
|
Routing - PLANNING | 4/24/2020 | | 4/24/2020 | | DONE |
Sue Cummings
|
|
|
Sent to Ethan
|
Routing - Addressing | 4/24/2020 | | 4/24/2020 | | PASS |
Doug Chausow
|
|
|
|
Routing - PUBLIC WORKS | 4/24/2020 | | 4/24/2020 | | PASS |
Candy A. Nichols
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 4/24/2020 | | DONE |
|
|
|
|
Intake Approval | | | 4/24/2020 | | PASS |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 4/24/2020 | | DONE |
|
|
|
|
Intake Approval | | | 4/22/2020 | | FAIL |
|
|
|
1st Prescreen 4/22/20:
Foundation plan must be stamped and signed by an Idaho Licensed Engineer when in the hillside
|
Application received | | | 4/21/2020 | | DONE |
|
|
|
Application submitted via PDS Online on Apr 21 2020 4:00PM
|