FIRE-Conference | 7/13/2020 | 7/14/2020 | 7/14/2020 | A | DONE |
Troy Cobbley
|
|
|
For a final the fire extinguisher needs hung as discussed and the Impact Protection needs to meet IFC 312.
Sean anytime after 9 - */Screened*/ Phone #: ###-####
|
BLD-Foundation | 6/16/2020 | 6/17/2020 | 6/17/2020 | A | PART |
Tell Riley
|
|
|
Screened- sHAWN-please go after 9am Phone #: ###-####//housekeeping pad, rebar per plan, excavated area has water due to rain, contractor will remove cage, get water out and re compact subgrade prior to installing concrete//WIP//
|
Issue PAID IN FULL permit | | | 6/9/2020 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 6/9/2020 | | DONE |
|
|
|
|
Route to Impact Fee Review | 5/18/2020 | 5/21/2020 | 5/19/2020 | | PASS |
Shannon Cade
|
|
|
Review requested for Commercial Permit
|
Permit Ready to Issue | | | 5/19/2020 | | DONE |
|
|
|
MET GC Maegan Black
|
Routing - FIRE | 5/11/2020 | 5/11/2020 | 5/18/2020 | | PASS |
Erika Akin
|
|
|
Load bank added to site. No impact to existing FD access. PDS/Fire to verify vehicle impact protection reinstalled in compliance with IFC 312.
|
1st review completed | | | 5/18/2020 | | DONE |
Michael Hanson
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 5/18/2020 | | DONE |
Michael Hanson
|
|
|
|
Plan assigned to (M_H) | 5/11/2020 | | 5/18/2020 | | DONE |
Michael Hanson
|
|
|
05/13 #518 L1 ePlan - VZW MSC Electrical Upgrade
|
Routing - Design Review | 5/11/2020 | | 5/13/2020 | | PASS |
Josh Wilson
|
|
|
Per ePlan approval
|
Routing - PLAN CHECK | 5/11/2020 | | 5/13/2020 | | PASS |
Michael Hanson
|
|
|
|
Intake Approval | | | 5/7/2020 | | PASS |
Javier Guzman
|
|
|
|
Intake Approval | | | 4/29/2020 | | FAIL |
Javier Guzman
|
|
|
For prescreen review provide and upload the following:
• The 304 form is naming John Floren as the responsible engineer/architect, but the plans are stamped by John D. Siefken, provide John Floren Idaho State engineer # or Idaho state architects # or provide John D. Siefken information for the responsible person.
• Per ePlan submittal standards the reserve the bottom right corner on the drawing plans for City approval stamps. Leave a blank 4” x 4” space located 3” off the right sheet edge to allow for the title block on plan sheet G010, AD100, E502 see ePlan standards at https://www.cityofboise.org/media/7025/electronic_submittal_standards.pdf
|
Intake Approval | | | 4/27/2020 | | FAIL |
Javier Guzman
|
|
|
For prescreen review provide and upload the following:
• Provide a completed 518 checklist (Incomplete submittals will not be accepted)
• The checklist is not complete unless all information is filled out, all appropriate boxes are checked and all plan page numbers are listed.
• Provide items that are requested from the checklist that apply to the project. Checklist can be found at https://www.cityofboise.org/departments/planning-and-development-services/building/building-permits/?category=all&search=all
• All plan sheets are required to be stamped, signed and dated by the Idaho licensed engineer or an Idaho licensed architect
• Per ePlan submittal standards the plans are required to be uploaded individually not as a packet. See ePlan submittal standards for naming each sheet at https://www.cityofboise.org/media/7025/electronic_submittal_standards.pdf
• Per ePlan submittal standards the reserve the bottom right corner on the drawing plans for City approval stamps. Leave a blank 4” x 4” space located 3” off the right sheet edge to allow for the title block. see ePlan standards at https://www.cityofboise.org/media/7025/electronic_submittal_standards.pdf
|
Application received | | | 4/24/2020 | | DONE |
|
|
|
Application submitted via PDS Online on Apr 24 2020 11:29AM
|