BLD-Conference | 6/19/2020 | 6/19/2020 | 6/19/2020 | P | DONE |
Brandon Shaw
|
|
|
On site consultation.
|
Plan assigned to (JAB) Josh | 5/1/2020 | 5/1/2020 | 5/18/2020 | | PASS |
Josh Bogle
|
|
|
|
Routing - PLAN CHECK | 5/18/2020 | | 5/18/2020 | | PASS |
Josh Bogle
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 5/18/2020 | | DONE |
Josh Bogle
|
|
|
ESC no - Energy no
|
Permit Ready to Issue | | | 5/18/2020 | | DONE |
|
|
|
met
|
Issue PAID IN FULL permit | | | 5/18/2020 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 5/18/2020 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 5/1/2020 | | 5/15/2020 | | FAIL |
Josh Bogle
|
|
|
needs dimensions and window call-outs
|
1st review completed | | | 5/15/2020 | | FAIL |
Josh Bogle
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 5/1/2020 | | DONE |
|
|
|
|
Intake Approval | | | 5/1/2020 | | PASS |
|
|
|
|
Intake Approval | | | 4/29/2020 | | FAIL |
|
|
|
Prescreen 1:
1.Please show a before and after floorplan and call out any structural components that are being changed. Additionally, call out if fixtures that require plumbing (sinks, dishwashers etc.) are being moved from their current location.
2. You included a site plan with your drawings, are you adding any exterior windows/elements? If so please show setback dimensions to property lines.
FYI: The building code exempts interior work such as painting, floor covering, cabinets, counter tops and wall coverings from permit requirements. A permit is required if the project removes wall coverings to expose the framing; builds a wall or partition (whether bearing or non-bearing) or relocates sinks, tubs, showers or water closets which require plumbing.
|
Application received | | | 4/27/2020 | | DONE |
|
|
|
Application submitted via PDS Online on Apr 27 2020 9:03AM
|