Information based on query as of Saturday, June 29, 2024.
Permit Information
Permit NumberBLD20-01402
StatusIssued
Name BENITON CONSTRUCTION
Site Address 8055 W GODDARD RD
Project NameCapital High School Auditorium
Customer NumberBLD20-01618 EARLY START
ePlanReviewYes
Description
**EXPEDITED SCHOOL REVIEW** PM-Ron Hill** (CAPITAL HIGH SCHOOL AUDITORIUM) (BLD20-01618 Early Start) Permit for a minor remodel to the existing High School auditorium and five 2nd floor classrooms. Work to include: remodeling existing restrooms, adding accessible single-user restroom, extending stage, new stairs and accessible ramp to the stage, mechanical, electrical, and plumbing work, and interior finishes in compliance with Ch. 8 of the 2015 IBC. Special Inspections required per the attached Form 310. Deferred Submittal for Metal Stairs and Handrails and Cable Guardrail System. This is a scope of work permit with a certificate of completion to be issued upon approval and completion of the designated work. Risk Category III. This building is partially fire sprinklered for occupancy and area with a pending upgrade agreement. The upgrade agreement is attached in the documents. Fire sprinklers and alarms will be extended into the auditorium and classrooms in compliance with the upgrade agreement under BLD11-00450. Any alterations or modifications to the buildings Fire Sprinkler or Fire Alarm system WILL REQUIRE A SEPARATE PERMIT and shall be installed per NFPA 13 & NFPA 72 as regulated by the Boise Fire Department. **JAR**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
FIRE-Final Inspection8/6/20208/6/20208/6/2020PPASS
DetailsTroy Cobbley
life safety passed. Phone #: ###-#### Inspection requested via web by Doug Storey
BLD-Ceiling Grid Inspection7/30/20207/31/20207/31/2020APART
DetailsTell Riley
Phone #: ###-#### Inspection requested via web by Doug Storey//grid looks ok//Electrical passed//new RTU in end classroom will need to be inspected when installed//pending fire sprinkler approval//
BLD-Conference7/16/20207/17/20207/17/2020ADONE
DetailsTell Riley
Please call 30 min. prior to make sure we are onsite. Thank you. Phone #: ###-#### Inspection requested via web by Doug Storey
BLD-Wall Bracing7/10/20207/10/20207/10/2020PPASS
DetailsTell Riley
Phone #: ###-#### Inspection requested via web by Doug Storey//scope of permit needs to be updated to remove the phase of work for the auditorium//inspection is on the five classrooms only//wall brackets installed, located on opposite side of previously installed wall brackets to brace the CMU as directed by the architect//no structural details were provided for these brackets//appear to meet sizes per the plans//special inspections were completed for the anchors//
Inspection Record Card- Bld  7/10/2020 DONE
Issue PAID IN FULL permit  6/29/2020 DONE
Inspection Record Card- Bld  6/29/2020 DONE
Plan assigned to (JAR)5/13/20205/13/20206/4/2020 DONE
DetailsJulie Romig
06/04 - 2nd Rev - **EXPEDITED REVIEW** Capital High School
Routing - PLAN CHECK5/29/2020 6/4/2020 PASS
DetailsJulie Romig
PLANS/APPL TAKEN TO FRONT DESK  6/4/2020 DONE
Permit Ready to Issue  6/4/2020 DONE
***HAS TO BE ISSUED WITH EARLY START BLD20-01618*****

MET bgrote@beniton.com
Need GC
Need Revised Values
****EARLY START MUST BE PAID FOR AND ISSUED***
Route to Impact Fee Review5/26/20205/29/20205/27/2020 PASS
DetailsShannon Cade
Review requested for Commercial Permit
1st review completed  5/26/2020 FAIL
DetailsJulie Romig
Routing - PLAN CHECK5/13/2020 5/26/2020 FAIL
DetailsJulie Romig
Routing - ELECTRICAL5/13/2020 5/26/2020 PASS
DetailsJavier Guzman
Routing - FIRE5/13/20205/13/20205/22/2020 PASS
DetailsErika Akin
Attached comments to case
Routing - Erosion and Sediment5/13/2020 5/22/2020 PASS
DetailsMichael Zawacki
TI inside school, no esc required. Please keep any outside storage clean.
Routing - Design Review5/13/2020 5/15/2020 PASS
DetailsKatelyn Menuge
No DR Overlay
Routing - PLUMBING5/13/2020 5/14/2020 PASS
DetailsDaryl Spivey
Per plan and ISPC
Routing - PUBLIC WORKS5/13/2020 5/14/2020 PASS
DetailsMorgan Webb
CONTACT WEST BOISE SEWER DISTRICT
Routing - MECHANICAL5/13/2020 5/13/2020 PASS
DetailsTroy James
Routing - PLANNING5/13/2020 5/13/2020 PASS
DetailsEthan Mansfield
Routing - Addressing5/13/2020 5/13/2020 PASS
DetailsDoug Chausow
Intake Approval  5/11/2020 PASS
Intake Approval  5/4/2020 FAIL
DetailsJenny Nelson
To complete this application please provide the following:
1. This will need to be submitted as a 520 major tenant improvement, please upload a completed 520 submittal checklist. It can be found here: https://www.cityofboise.org/media/9949/520_major-ti-submittal-checklist.pdf
2. Please provide site specific fire flow letter.
3. Please upload structural calculations - indicated on submittal checklist but do not see in documents.
Application received  4/28/2020 DONE
Application submitted via PDS Online on Apr 28 2020 8:32AM