Information based on query as of Thursday, May 7, 2026.
Permit Information
Permit NumberBLD20-01469
StatusIssued
Name ESI
Site Address 1500 W SHORELINE DR
Project NameTandem Diabetes Care Exterior
Customer Number 
ePlanReviewYes
Description
(TANDEM DIABETES CARE - EXTERIOR TI) (CZC20-00152) (BLD20-00796 INTERIOR TI) Scope of work permit to remodel the exterior facade of an existing 1-story 94,695 sq ft office building. This building is separated by a 4-hour fire wall into two buildings. The 71,508 sq ft West building is of Type IIIB Construction and the 22,097 sq ft East building is of Type VB Construction. Work to include: Patching & painting exteirior, installation of new generator and fenced enclosure, new gates and repair CMU on existing trash enclosure, installation of new exterior entry doors. Special inspections required per attached Form 310. This building is fully Fire Sprinklered with an approved Fire Alarm system for area increase. Any alterations or modifications to the buildings Fire Sprinkler or Fire Alarm system WILL REQUIRE A SEPARATE PERMIT and shall be installed per NFPA 13 & NFPA 72 as regulated by the Boise Fire Department. **JAR**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Telephone call  6/12/2020 DONE
emailed sasha about revised value. ele is higher than overall project
Issue PAID IN FULL permit  6/12/2020 DONE
Inspection Record Card- Bld  6/12/2020 DONE
Route to Impact Fee Review6/10/20206/13/20206/11/2020 PASS
DetailsShannon Cade
Review requested for Commercial Permit
Permit Ready to Issue  6/11/2020 DONE
met
Need:
Revised Certificate of Value
gc form Sasha Varone
Routing - FIRE5/15/20205/15/20206/10/2020 PASS
DetailsErika Akin
Attached comments to case
Plan assigned to (JAR)5/15/20205/15/20206/10/2020 DONE
DetailsJulie Romig
06/09 - Bldg Rev Comp - L3 Tandem Diabetes Exterior improvements
1st review completed  6/10/2020 DONE
DetailsJulie Romig
PLANS/APPL TAKEN TO FRONT DESK  6/10/2020 DONE
Routing - PLAN CHECK5/15/2020 6/5/2020 PASS
DetailsJulie Romig
Routing - Erosion and Sediment5/15/2020 5/22/2020 PASS
DetailsMichael Zawacki
TI. Extensive work. If good housekeeping not followed site will need plan.
No disturbances in description.
Routing PW Flood Plain5/15/2020 5/20/2020 PASS
DetailsJason C. Taylor
Project does not meet the Substantial Improvements section of Boise Floodplain Ordinance .No floodplain requirements. If you have any questions, please call Jason Taylor at ###-####.
Routing PW Drainage5/18/2020 5/20/2020 PASS
DetailsJason C. Taylor
Routing - Design Review5/15/2020 5/20/2020 PASS
DetailsKatelyn Menuge
CZC20-00152
Routing PW Solid Waste5/18/2020 5/19/2020 PASS
DetailsEvan Carpenter
Routing - PUBLIC WORKS5/15/2020 5/18/2020 PASS
DetailsMorgan Webb
Routing - PLANNING5/15/2020 5/15/2020 PASS
DetailsDavid Moser
Routing - Addressing5/15/2020 5/15/2020 PASS
DetailsDoug Chausow
Intake Approval  5/13/2020 PASS
Intake Approval  5/5/2020 FAIL
DetailsJavier Guzman
For prescreen review provide and upload the following:
• In the uploaded 310 form provide the missing owners signature or architect’s signature on the cover sheet and date
• Provide DR/Planning & Zoning letters of approval.
Application received  5/4/2020 DONE
Application submitted via PDS Online on May 4 2020 12:56PM