Information based on query as of Tuesday, July 16, 2024.
Permit Information
Permit NumberBLD20-01478
StatusIssued
Name PKSANDFORD CONSTRUCTION LLC
Site Address 2914 W MADISON AVE
Project NameEkberg ADU
Customer Number 
ePlanReviewYes
Description
**PRESCRIPTIVE ENERGY REQUIREMENT**Permit for the construction of a new 598 sq. ft., one story accessory dwelling unit with 1 bedrooms, 1 bathrooms, approximately 138 sq. ft. of covered patio/porch per the approved plans and any notations. R1-C zoning and setbacks per planning. D_S
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Foundation7/20/20207/21/20207/21/2020PPART
DetailsMike Jordan
Patrick *screened* Phone #: ###-####. Ok for mono placement. Needs to dig out bottom of footing in north east corner. Ok to place concrete.
Telephone call  6/5/2020 DONE
Emailed applicant to inform them not all the fees permits were paid. Once all remaining fees are paid we can issue the permits.
Issue PAID IN FULL permit  6/5/2020 DONE
Inspection Record Card- Bld  6/5/2020 DONE
OVERRIDE  6/4/2020  
Plan assigned to (D_S) Debbie5/28/20205/28/20206/4/2020 DONE
DetailsDebbie Sanine
Routing - PLAN CHECK6/4/2020 6/4/2020 PASS
DetailsDebbie Sanine
PLANS/APPL TAKEN TO FRONT DESK  6/4/2020 DONE
DetailsDebbie Sanine
Permit Ready to Issue  6/4/2020 DONE
Plan assigned to (JAB) Josh5/12/20205/12/20205/28/2020 DEFR
DetailsJosh Bogle
05/18 ADU, ePlan
Routing - PLAN CHECK5/12/2020 5/28/2020 FAIL
DetailsJosh Bogle
1st review completed  5/28/2020 FAIL
DetailsDebbie Sanine
Routing - PLANNING5/18/2020 5/18/2020 PASS
DetailsKarla Nelson
Revised Site Plan uploaded on 5/18 is ok, parking area will need to be paved. Applicant is aware of this requirement, planning will check before occupancy.
Telephone call  5/18/2020 DONE
Left a voice message with the GC to verify company info
Route to Impact Fee Review5/12/20205/15/20205/14/2020 PASS
DetailsShannon Cade
Initial residential review of new SFD permits requested for now.
Routing - PLANNING5/12/2020 5/14/2020 FAIL
DetailsKarla Nelson
Site Plan revisions required showing a 9X20 parking space off the alley that complies with 22' of backup required. Side yard landscape separation is also required if placed along the east property boundary.
Intake Approval  5/12/2020 PASS
Routing - MECHANICAL5/12/2020 5/12/2020 PASS
DetailsTroy James
No acca report. Mechanical ventilation system is required. Field verify.
Routing - PLANNING5/12/2020 5/12/2020 DONE
DetailsSue Cummings
sent to Karla
Routing - Addressing5/12/2020 5/12/2020 PASS
DetailsDoug Chausow
ADU Address: 2914 W Madison Ave
Routing - PUBLIC WORKS5/12/2020 5/12/2020 PASS
DetailsCandy A. Nichols
ADU
Intake Approval  5/11/2020 FAIL
Looks like DWG Plan Set Pg 3 Mini Split and DWG Site Plan still need to be large plans. I show them as 8x11. Please upload both those plans in a 18x24 or larger and we can get the review started.
Intake Approval  5/8/2020 FAIL
3rd Prescreen: 5-8-20
//Corrections have been made, however, files are coming in blurry and we are unable to accept it in its current form.
1. Please re-upload files in large format, clear, and with corrections made
2. If you require assistance, please contact the permit desk ###-####
Intake Approval  5/8/2020 FAIL
plans were not blury but they were the wrong size- and i accidently accepted the task but Christina jumped it back to Corrections, applicant was called and iformed that the plans need to be bigger size
Intake Approval  5/7/2020 FAIL
2nd prescreen: 5-7-20:
1. Please upload the Manual J into the documents folder or state on the plans if its a mini split.
2. Please provide the compliance energy perceptive chart on the plans. (could not find it)
3. All drawings in the drawings folder much be uploaded as individual files in landscape format and with files names for what is on the drawing (example A1 Site Plan or Site Plan) (we will have to delete that plans that are more than 1 page).
Application received  5/5/2020 DONE
Application submitted via PDS Online on May 5 2020 8:59AM
Intake Approval  5/5/2020 FAIL
Prescreen 1:
1. Please show prescriptive energy requirements on plan set. Or Res Check
2.Indicate how the ADU will be heated. If heated with an HVAC system please provide ACCA Approved Manual J or other load calculation simulation
3.Please indicate code year plans are designed. Keep in mind we have currently adopted the 2015 IRC.