BLD-Framing/Rough-in | 6/12/2020 | 6/15/2020 | 6/15/2020 | P | PASS |
Tell Riley
|
|
|
Chuck ###-#### call first 15 mins//ok to continue, hardware added per enginering, engineering for rafters updated//still need verification of 2x8 deck joists as plans show 2x10s//home owner will get electrical permit and inspection prior to cover//
|
BLD-Framing/Rough-in | 6/12/2020 | 6/12/2020 | 6/12/2020 | P | NR |
Tell Riley
|
|
|
aaron Phone #: ###-####//used as conference to review updated engineering and discuss framing//some corrections were met and a few thing still need completed//
|
BLD-Framing/Rough-in | 6/8/2020 | 6/8/2020 | 6/8/2020 | P | NR |
Tell Riley
|
|
|
Aaron *screened* Phone #: ###-####//still need framing to match engineering or engineering to reflect as built porch and cover//need to add supprt to overbuild//footing size verified where new//existing footings need to be approved for use by engineer//
|
BLD-Framing/Rough-in | 6/1/2020 | 6/2/2020 | 6/2/2020 | A | FAIL |
Tell Riley
|
|
|
call access- Aaron *screened* Phone #: ###-####//cn issued//need deck and patio cover to reflect engineering and plans--may need engineer to re-evaluate the existing structure as it is already built//need verification of footing size and engineers ok for exisitng footings under the slab//open areas covered for inspection or overbuild and framing connections//deck framing needs to be per engineering//
|
Issue PAID IN FULL permit | | | 6/1/2020 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 6/1/2020 | | DONE |
|
|
|
|
Telephone call | | | 5/29/2020 | | DONE |
|
|
|
sent message to applicant asking whetehr they will be the GC on the project or will the hire
|
Telephone call | | | 5/29/2020 | | DONE |
|
|
|
Per telephone call, GC sent in a 302 form this morning.
|
Plan assigned to (JAB) Josh | 5/7/2020 | 5/7/2020 | 5/28/2020 | | PASS |
Josh Bogle
|
|
|
05/13 patio cover, ePlan - 1st done
|
Routing - PLAN CHECK | 5/28/2020 | | 5/28/2020 | | PASS |
Josh Bogle
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 5/28/2020 | | DONE |
Josh Bogle
|
|
|
ESC no - Energy no
|
Permit Ready to Issue | | | 5/28/2020 | | |
|
|
|
met
NEED GC
|
Plan Reviewer's activity | | | 5/27/2020 | | DONE |
Josh Bogle
|
|
|
see e-mail to Laura
|
Plan Reviewer's activity | | | 5/22/2020 | | DONE |
Josh Bogle
|
|
|
acceptred resubmital - talked with engineer - set up a video conference with applicant
|
1st review completed | | | 5/8/2020 | | FAIL |
Josh Bogle
|
|
|
|
Routing - PLAN CHECK | 5/7/2020 | | 5/8/2020 | | FAIL |
Josh Bogle
|
|
|
needs engineering
|
Routing - PLANNING | 5/7/2020 | | 5/7/2020 | | PASS |
Sue Cummings
|
|
|
|
Intake Approval | | | 5/7/2020 | | FAIL |
|
|
|
please provide site plan showing whole property, where the patio cover is located and the distance from the property lines.
|
Plans ACCEPTED BY PLAN TECH | | | 5/7/2020 | | DONE |
|
|
|
|
Intake Approval | | | 5/7/2020 | | PASS |
|
|
|
|
Application received | | | 5/6/2020 | | DONE |
|
|
|
Application submitted via PDS Online on May 6 2020 9:17AM
|