BLD-Energy code compliance | 7/22/2020 | 7/24/2020 | 7/24/2020 | A | PASS |
Brandon Shaw
|
|
|
Kevin *screened Phone #: ###-####
|
BLD-Framing/Rough-in | 7/21/2020 | 7/22/2020 | 7/22/2020 | P | PASS |
Brandon Shaw
|
|
|
SCREENED // Kevin Phone #: ###-####
|
BLD-Foundation | 6/19/2020 | 6/19/2020 | 6/19/2020 | P | PASS |
Brandon Shaw
|
|
|
Mono pour...
|
Telephone call | | | 6/18/2020 | | DONE |
|
|
|
emailed GC to inform them we need an RP before issuance of these permits.
|
Issue PAID IN FULL permit | | | 6/18/2020 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 6/18/2020 | | DONE |
|
|
|
|
OVERRIDE | | | 6/16/2020 | | |
|
|
|
|
Plan assigned to (BJM) | 6/3/2020 | 6/3/2020 | 6/16/2020 | | DONE |
Brian McGowan
|
|
|
06/15- 1st Review Complete- 05/22 ADU, ePlan
|
Routing - PLAN CHECK | 6/16/2020 | | 6/16/2020 | | PASS |
Brian McGowan
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 6/16/2020 | | DONE |
Brian McGowan
|
|
|
|
Permit Ready to Issue | | | 6/16/2020 | | DONE |
|
|
|
MET- NEED
RP
met-(information on application) GC Form
|
Routing - MECHANICAL | 6/11/2020 | | 6/11/2020 | | PASS |
Troy James
|
|
|
|
1st review completed | | | 6/4/2020 | | FAIL |
Brian McGowan
|
|
|
|
Routing - PLAN CHECK | 5/18/2020 | | 6/4/2020 | | FAIL |
Brian McGowan
|
|
|
|
Plan assigned to (JAB) Josh | 5/18/2020 | 5/18/2020 | 6/3/2020 | | DEFR |
Josh Bogle
|
|
|
05/22 ADU, ePlan
|
Routing - PLANNING | 5/18/2020 | | 5/22/2020 | | PASS |
Ethan Mansfield
|
|
|
|
Routing - Addressing | 5/18/2020 | | 5/19/2020 | | PASS |
Doug Chausow
|
|
|
ADU address: 2706 S Greenwood Cir
|
Routing - PUBLIC WORKS | 5/18/2020 | | 5/19/2020 | | PASS |
Candy A. Nichols
|
|
|
ADU
|
Routing - MECHANICAL | 5/18/2020 | | 5/19/2020 | | FAIL |
Troy James
|
|
|
Emailed applicant to provide ACCA report.
|
Plans ACCEPTED BY PLAN TECH | | | 5/18/2020 | | DONE |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 5/18/2020 | | DONE |
|
|
|
|
Route to Impact Fee Review | 5/14/2020 | 5/17/2020 | 5/15/2020 | | PASS |
Shannon Cade
|
|
|
Initial residential review of new SFD permits requested for now.
|
Intake Approval | | | 5/14/2020 | | FAIL |
|
|
|
(Please refer to the 402 checklist for a ADU)
1. Please upload a Manual J or if its a mini split write it on the plans.
2. Please provide a ResCheck or the compliance with perspective on the plans.
3. Please show all the Electrical switch's and fans along with the smoke detectors that are shown.
4. Please upload a copy of the Zoning approval letter into the documents folder.
|
Application received | | | 5/6/2020 | | DONE |
|
|
|
Application submitted via PDS Online on May 6 2020 11:51AM
|