BLD-Wall Bracing | 7/27/2020 | 7/27/2020 | 7/27/2020 | P | PASS |
Dave Hannah
|
|
|
call ahead - screened // Sean Phone #: ###-####
|
BLD-Framing/Rough-in | 7/27/2020 | 7/27/2020 | 7/27/2020 | P | PASS |
Dave Hannah
|
|
|
screened // Sean Phone #: ###-####
|
Issue PAID IN FULL permit | | | 7/22/2020 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 7/22/2020 | | DONE |
|
|
|
|
Route to Impact Fee Review | 6/19/2020 | 6/22/2020 | 6/19/2020 | | PASS |
Shannon Cade
|
|
|
Review requested for Commercial Permit
|
Routing - FIRE | 6/17/2020 | 6/17/2020 | 6/19/2020 | | PASS |
Erika Akin
|
|
|
No comments attached. Modifications to the existing automatic sprinkler system in this facility may be required for the improvements planned. The tenant improvement plans shall be reviewed by a licensed fire sprinkler contractor, to determine what, if any, modifications are necessary to maintain code compliance within the project area. The fire sprinkler system is required to comply with NFPA 13 and the fire alarm system is required to comply with NFPA 72 as regulated by the Fire Department. Separate fire sprinkler permits and fire alarm permits shall be obtained prior to beginning any modification or installation work on such systems.
|
Plan assigned to (J_N) | 6/17/2020 | 6/17/2020 | 6/19/2020 | | DONE |
Jenny Nelson
|
|
|
1st complete, waiting for fire review
|
1st review completed | | | 6/19/2020 | | DONE |
Jenny Nelson
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 6/19/2020 | | DONE |
Jenny Nelson
|
|
|
|
Permit Ready to Issue | | | 6/19/2020 | | DONE |
|
|
|
ALL MET Kay
GC
REV VALUES
|
Plan assigned to (BJM) | 5/27/2020 | 5/27/2020 | 6/17/2020 | | DEFR |
Brian McGowan
|
|
|
06/01 L1 Ada County Scanning Center TI ePlan
|
Routing - PLAN CHECK | 5/27/2020 | | 6/17/2020 | | PASS |
Jenny Nelson
|
|
|
|
Plan Reviewer's activity | | | 6/17/2020 | | DONE |
Jenny Nelson
|
|
|
Deferred from BJM, during review looks like basement storage area is S1 occupancy (BLD05-03740), new scanning office area will be B occupancy - adding fire review due to change of use
|
Routing - PUBLIC WORKS | 5/27/2020 | | 5/29/2020 | | PASS |
Morgan Webb
|
|
|
NO NEW PLUMBING
|
Routing - Addressing | 5/27/2020 | | 5/28/2020 | | PASS |
Doug Chausow
|
|
|
|
Plan Reviewer's activity | | | 5/26/2020 | | DONE |
Brian McGowan
|
|
|
A previous permit for an office was done in this area based on the existing basement was a B Occupancy.
|
Intake Approval | | | 5/26/2020 | | PASS |
Javier Guzman
|
|
|
|
Intake Approval | | | 5/21/2020 | | FAIL |
Brian McGowan
|
|
|
Altering a Storage area to Offices is a Change of Use. Application #520 must be used. Please upload the #520 Application and the #520 Checklist. Provide the required documents and drawings from the #520 Checklist.
1. Current Checklist lists Sheets M0.0, A8.0, A9.0. No Sheets M0.0, A8.0, A9.0 were uploaded.
2. Portable Fire extinguishers are not shown.
3. Please evaluate if the proposed double doors can open into the corridor.
4. The provided Key Plan does not show any other rooms, corridors, storage areas. No egress path or distances are shown nor can be determined without further info.
5. What Occupant load are you proposing, if there is an increase will it affect the plumbing fixture count?
6. Please provide the required information and documents as required by the 520 checklist.
|
Application received | | | 5/12/2020 | | DONE |
|
|
|
Application submitted via PDS Online on May 12 2020 2:13PM
|