Information based on query as of Wednesday, July 24, 2024.
Permit Information
Permit NumberBLD20-01567
StatusFinaled
Name BLUE RAVEN SOLAR LLC
Site Address 5534 N CASTLE HILL WAY
Project NameStevens PV
Customer Number 
ePlanReviewYes
Description
Permit for 280 sq' of roof-mounted, grid-tied Photo-voltaic panels with micro-inverters; 16 panels in 3 arrays. No work needed to strengthen the existing roof structure per engineer’s roof evaluation. All racking, modules, and other listed equipment must be installed by a certified installer. All work per plans, engineering, manufacturer’s specs, & local code. Separate electrical permit required. **D_S**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final5/28/20205/29/20205/29/2020PDONE
DetailsTony Young
Taylor Barton is the onsite contact - ###-#### Phone #: ###-#### Inspection requested via web by BRS Permitting
DOC - Permit Finaled5/29/20205/29/20205/29/2020PPASS
DetailsTony Young
BLD-Framing/Rough-in5/26/20205/28/20205/28/2020PDONE
DetailsTony Young
Taylor Barton is the onsite contact - ###-#### Phone #: ###-#### Inspection requested via web by BRS Permitting
BLD-Framing/Rough-in5/26/20205/28/20205/28/2020ADONE
DetailsTony Young
Taylor Barton is the onsite contact - ###-#### Phone #: ###-#### Inspection requested via web by BRS Permitting// nothing needed for framing per engineer
Plan assigned to (D_S) Debbie5/13/20205/13/20205/14/2020 DONE
DetailsDebbie Sanine
1st review completed  5/14/2020 DONE
DetailsDebbie Sanine
PLANS/APPL TAKEN TO FRONT DESK  5/14/2020 DONE
DetailsDebbie Sanine
Permit Ready to Issue  5/14/2020 DONE
met
Issue PAID IN FULL permit  5/14/2020 DONE
Routing - PLANNING5/13/2020 5/14/2020 PASS
DetailsSue Cummings
Application received  5/13/2020 DONE
Application submitted via PDS Online on May 13 2020 3:54PM
Plan assigned to (JAB) Josh5/13/20205/13/20205/13/2020 DEFR
DetailsJosh Bogle
Routing - PLAN CHECK5/13/2020 5/13/2020 PASS
DetailsJosh Bogle
Energy-N ESC-N
Plans ACCEPTED BY PLAN TECH  5/13/2020 DONE
Intake Approval  5/13/2020 PASS
Recd Pcfee & Taken To Pln CK  5/13/2020 DONE