BLD-Framing/Rough-in | 6/29/2020 | 6/29/2020 | 6/29/2020 | P | PASS |
Tell Riley
|
|
|
Call ahead, Larry Phone #: ###-####//ok to continue// no electrical will be installed//
|
Plan assigned to (JAB) Josh | 5/19/2020 | 5/19/2020 | 6/15/2020 | | PASS |
Josh Bogle
|
|
|
05/25 remodel, ePlan - 1st done
|
Routing - PLAN CHECK | 6/15/2020 | | 6/15/2020 | | PASS |
Josh Bogle
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 6/15/2020 | | DONE |
Josh Bogle
|
|
|
ESC no - Energy no
|
Permit Ready to Issue | | | 6/15/2020 | | DONE |
|
|
|
met
|
Issue PAID IN FULL permit | | | 6/15/2020 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 5/19/2020 | | 6/8/2020 | | FAIL |
Josh Bogle
|
|
|
hybrid structure, needs engineering
|
1st review completed | | | 6/8/2020 | | FAIL |
Josh Bogle
|
|
|
|
Intake Approval | | | 5/19/2020 | | PASS |
|
|
|
|
Routing - PLANNING | 5/19/2020 | | 5/19/2020 | | PASS |
Jeff Lowe
|
|
|
|
Intake Approval | | | 5/18/2020 | | FAIL |
|
|
|
1. Please upload a site plan that shows set backs, driveways and streets.
2. Drawings/plans must be uploaded in PDF format.
|
Application received | | | 5/13/2020 | | DONE |
|
|
|
Application submitted via PDS Online on May 13 2020 4:18PM
|