BLD-Framing/Rough-in | 7/14/2020 | 7/14/2020 | 7/14/2020 | P | PASS |
Tony Young
|
|
|
Jerry - Requesting Virtual Inspection Phone #: ###-####
|
BLD-Wall cover | 6/15/2020 | 6/16/2020 | 6/16/2020 | P | PART |
Tell Riley
|
|
|
Jerrold- picture inspection please, call please, traveled out of state in last 14 days. Phone #: ###-####//area around tub ok to cover when insulation added and niche is moved to the interior wall//this is only for partial cover in this area as mechanical and electrical will need to be completed prior to any other areas covered//
|
Issue PAID IN FULL permit | | | 6/11/2020 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 6/11/2020 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 6/10/2020 | | DONE |
|
|
|
|
Plan assigned to (JAB) Josh | 5/21/2020 | 5/21/2020 | 6/9/2020 | | PASS |
Josh Bogle
|
|
|
05/27 remodel, ePlan
|
Routing - PLAN CHECK | 5/21/2020 | | 6/9/2020 | | PASS |
Josh Bogle
|
|
|
|
1st review completed | | | 6/9/2020 | | DONE |
Josh Bogle
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 6/9/2020 | | DONE |
Josh Bogle
|
|
|
ESC no - Energy no
|
Intake Approval | | | 5/21/2020 | | PASS |
|
|
|
|
Intake Approval | | | 5/20/2020 | | FAIL |
|
|
|
Please provide a full before and after floor plan of the main floor (full floor plan if that is not all of the basement). Please separate your plan sheet from your three page of notes. Please rotate plan sheet to the correct orientation
|
Application received | | | 5/15/2020 | | DONE |
|
|
|
Application submitted via PDS Online on May 15 2020 10:39AM
|