Permit Information
Permit NumberBLD20-01599
StatusFinaled
Name BLUE RAVEN SOLAR LLC
Site Address 8851 W WICHITA DR
Project NameBean PV
Customer Number 
ePlanReviewYes
Description
Permit for 437.5 sq' of roof-mounted, grid-tied Photo-voltaic panels with micro-inverters; 25 panels in 2 arrays. No work needed to strengthen the existing roof structure per engineer’s roof evaluation. All racking, modules, and other listed equipment must be installed by a certified installer. All work per plans, engineering, manufacturer’s specs, & local code. Separate electrical permit required. **D_S**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final7/1/20207/2/20207/2/2020PDONE
DetailsMike Jordan
Onsite contact: Mierins
###-#### Phone #: ###-#### Inspection requested via web by BRS Permitting
DOC - Permit Finaled7/2/20207/2/20207/2/2020PPASS
DetailsMike Jordan
BLD-Framing/Rough-in6/30/20207/1/20207/1/2020APASS
DetailsMike Jordan
Jay Walters is the onsite contact - ###-#### Phone #: ###-#### Inspection requested via web by BRS Permitting. All modules placed per plan. All clearnces maintained. As per letter from structural engineer, no work need to reinforce existing roof.
BLD-Framing/Rough-in6/29/20206/30/20206/30/2020PCANC
DetailsMike Jordan
Jay Walters is the onsite contact - ###-#### Phone #: ###-#### Inspection requested via web by BRS Permitting
Issue PAID IN FULL permit  5/21/2020 DONE
Plan assigned to (D_S) Debbie5/15/20205/15/20205/19/2020 DONE
DetailsDebbie Sanine
PLANS/APPL TAKEN TO FRONT DESK  5/19/2020 DONE
DetailsDebbie Sanine
Permit Ready to Issue  5/19/2020 DONE
Routing - PLANNING5/15/2020 5/18/2020 PASS
DetailsJeff Lowe
Application received  5/15/2020 DONE
Application submitted via PDS Online on May 15 2020 12:34PM
Plan assigned to (JAB) Josh5/15/20205/15/20205/15/2020 DEFR
DetailsJosh Bogle
Routing - PLAN CHECK5/15/2020 5/15/2020 PASS
DetailsJosh Bogle
ESC-N Energy-N
Intake Approval  5/15/2020 PASS
1st review completed  5/15/2020 DONE
DetailsDebbie Sanine