BLD-Energy code compliance | 6/29/2020 | 6/30/2020 | 6/30/2020 | P | PASS |
Tony Young
|
|
|
Please call and I will meet you there. Thanks Dylan ###-#### Phone #: ###-#### Inspection requested via web by Dylan Schneider/ ok after verifing the air space above the insulation for venting ceiling area,, note.. not current code due to lack of space but better than prior insulation
|
BLD-Framing/Rough-in | 6/25/2020 | 6/26/2020 | 6/26/2020 | P | PASS |
Tony Young
|
|
|
House is occupied please call and I can let you in. Thanks!! Dylan ###-#### Phone #: ###-#### Inspection requested via web by Dylan Schneider
|
Issue PAID IN FULL permit | | | 6/25/2020 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 6/25/2020 | | DONE |
|
|
|
|
Plan assigned to (RDP) | 5/18/2020 | 5/18/2020 | 6/24/2020 | | DONE |
Rob Patrick
|
|
|
Resubmit 06/09: 1st Review Complete 06/03 Failed: 05/22 Remodel ePlan: Waiting for DR to receive letter of appropriateness
|
Routing - PLAN CHECK | 6/17/2020 | | 6/24/2020 | | PASS |
Rob Patrick
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 6/24/2020 | | DONE |
Rob Patrick
|
|
|
|
Permit Ready to Issue | | | 6/24/2020 | | DONE |
|
|
|
MET
|
Routing - Design Review | 6/17/2020 | | 6/18/2020 | | PASS |
Michaella Owens
|
|
|
|
Routing - Design Review | 6/8/2020 | | 6/8/2020 | | PEND |
Michaella Owens
|
|
|
resubmit after appeal period has passed.
|
Routing - PLAN CHECK | 6/8/2020 | | 6/8/2020 | | FAIL |
Rob Patrick
|
|
|
Design Review requires 10 Appeal
|
Routing - PLAN CHECK | 5/18/2020 | | 6/3/2020 | | FAIL |
Rob Patrick
|
|
|
Failed for Design Review comments.
|
1st review completed | | | 6/3/2020 | | FAIL |
Rob Patrick
|
|
|
Failed for Design Review comments.
|
Routing - Design Review | 5/20/2020 | | 5/26/2020 | | PEND |
Michaella Owens
|
|
|
requires a Certificate of Appropriateness. notified applicant and they should be submitting soon.
|
Plan Reviewer's activity | | | 5/20/2020 | | |
Rob Patrick
|
|
|
Routed to DR for review of Historic.
|
Intake Approval | | | 5/18/2020 | | FAIL |
|
|
|
Prescreen #1:
Plans incomplete.
1. Show before and after floorplan
2. Provide site plan if you are changing any exterior elements
3. narrative of what you propose to change in the kitchen. Exclude cabinets, flooring, and paint that do not require a permit.
4. Will plumbing, electrical, or mechanical be changed.
|
Plans ACCEPTED BY PLAN TECH | | | 5/18/2020 | | DONE |
|
|
|
|
Intake Approval | | | 5/18/2020 | | PASS |
|
|
|
|
Application received | | | 5/17/2020 | | DONE |
|
|
|
Application submitted via PDS Online on May 17 2020 10:48AM
|