BLD-Framing/Rough-in | 8/11/2020 | 8/11/2020 | 8/11/2020 | P | PASS |
Mike Jordan
|
|
|
please call 30 minutes or so before arrival so I can meet you there. Thanks ~ Kevin deBelloy Phone #: ###-#### Inspection requested via web by kevin debelloy. Interior steel stud framed walls, soffits and hardlids ok.
|
Issue PAID IN FULL permit | | | 7/20/2020 | | DONE |
|
|
|
|
Print Occupancy Form | | | 7/20/2020 | | DONE |
|
|
|
|
Telephone call | | | 7/16/2020 | | DONE |
|
|
|
Mitch confirmed address is 9048.emailed Mitch at ACHD and Jeff Hatch asking for confirmation on Rooster's location. This permit is for 9048 W Emerald, but Mitch at ACHD specified 9056. Both addresses are on the same parcel.
|
Plan assigned to (JG) | 6/5/2020 | 6/5/2020 | 7/15/2020 | | PASS |
Javier Guzman
|
|
|
07/15 2nd rev L3 Roosters ePlan, fire
|
Routing - PLAN CHECK | 7/9/2020 | | 7/15/2020 | | PASS |
Javier Guzman
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 7/15/2020 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 7/15/2020 | | DONE |
|
|
|
met (kevin@debelloyconstruction.com and shawn@debelloyconstruction.com)
Need GC
Need Revised Value
|
Routing - PUBLIC WORKS | 7/9/2020 | | 7/9/2020 | | PASS |
Morgan Webb
|
|
|
|
Routing - MECHANICAL | 7/9/2020 | | 7/9/2020 | | PASS |
Troy James
|
|
|
|
Route to Impact Fee Review | 7/6/2020 | 7/9/2020 | 7/6/2020 | | PASS |
Travis P Black
|
|
|
Review requested for Commercial Permit
|
1st review completed | | | 7/6/2020 | | FAIL |
Javier Guzman
|
|
|
|
Routing - FIRE | 6/5/2020 | 6/5/2020 | 7/5/2020 | | PASS |
Erika Akin
|
|
|
Attached comments to case
|
Routing - PLAN CHECK | 6/5/2020 | | 7/2/2020 | | FAIL |
Javier Guzman
|
|
|
|
Routing PW Environmental | 6/17/2020 | | 6/17/2020 | | PASS |
Zach Conde
|
|
|
PER ZACH: Approved on ePlan with this comment:"Approved with existing grease abatement." Please pass on Tidemark
|
Routing - PLANNING | 6/5/2020 | | 6/12/2020 | | PASS |
Karla Nelson
|
|
|
|
Routing - Addressing | 6/5/2020 | | 6/8/2020 | | PASS |
Doug Chausow
|
|
|
Corrected address: 9048 W Emerald St
|
Routing - MECHANICAL | 6/5/2020 | | 6/8/2020 | | PASS |
Troy James
|
|
|
|
Routing - PLUMBING | 6/5/2020 | | 6/8/2020 | | PASS |
Daryl Spivey
|
|
|
Per plan and ISPC
|
Routing - Design Review | 6/5/2020 | | 6/5/2020 | | PASS |
Josh Wilson
|
|
|
|
Intake Approval | | | 6/4/2020 | | PASS |
|
|
|
|
Intake Approval | | | 5/28/2020 | | FAIL |
Julie Romig
|
|
|
1. Leave a 4"x4" blank space in the lower right hand corner of the A-0.0 cover sheet. Leave a 4"x2" blank space in the lower right hand corner of all other sheets. Locate blank space 3" from right sheet edge.
2. In addition to the approved application, upload a copy of the CDH stamped approved floor plan (can be 8 1/2x11 or 11x17 small document).
3. Door hardware schedule for existing exterior doors and existing door to access restrooms.
4. Interior elevations showing all service counters (point of sale counter, drink station, bus station, etc) for verification of accessibility compliance. Identify furniture heights and location of all accessible seating (5% required).
|
Application received | | | 5/20/2020 | | DONE |
|
|
|
Application submitted via PDS Online on May 20 2020 11:56AM
|