BLD-Wall Bracing | 8/11/2020 | 8/12/2020 | 8/12/2020 | A | PASS |
Tell Riley
|
|
|
Shear // Mike Phone #: ###-####
|
BLD-Foundation | 8/11/2020 | 8/12/2020 | 8/12/2020 | A | CANC |
Tell Riley
|
|
|
Mike Phone #: ###-####
|
BLD-Footing | 7/23/2020 | 7/24/2020 | 7/24/2020 | A | PASS |
Dave Hannah
|
|
|
screened // Michael Phone #: ###-####//wall and footing//
|
BLD-Footing | 7/23/2020 | 7/23/2020 | 7/23/2020 | P | FAIL |
Tell Riley
|
|
|
screened // Michael Phone #: ###-####//need approved plans onsite for inspection//will need to sleeve the sewer line through both footings//
|
Issue PAID IN FULL permit | | | 6/26/2020 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 6/26/2020 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 6/25/2020 | | DONE |
|
|
|
MET
Need
GC Form (GC RCT number not in tidemark, is it homeowner or GC as the permit holder?)
|
Plan assigned to (BJM) | 6/24/2020 | 6/24/2020 | 6/24/2020 | | DONE |
Brian McGowan
|
|
|
06/16 addition, ePlan
|
Plan Reviewer's activity | | | 6/24/2020 | | DONE |
Brian McGowan
|
|
|
ENERGY - YES ESC- YES
|
1st review completed | | | 6/24/2020 | | DONE |
Brian McGowan
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 6/24/2020 | | DONE |
Brian McGowan
|
|
|
|
Routing - PLAN CHECK | 6/10/2020 | | 6/24/2020 | | PASS |
Brian McGowan
|
|
|
|
Plan assigned to (JAB) Josh | 6/10/2020 | 6/10/2020 | 6/10/2020 | | DEFR |
Josh Bogle
|
|
|
06/16 addition, ePlan
|
Intake Approval | | | 6/10/2020 | | PASS |
|
|
|
|
Routing - PLANNING | 6/10/2020 | | 6/10/2020 | | PASS |
Sue Cummings
|
|
|
|
Intake Approval | | | 6/9/2020 | | FAIL |
|
|
|
Please provide a whole cross section of the entire addition. Full length from top of roof to footings. Please call ###-#### if you have any questions.
|
Intake Approval | | | 5/26/2020 | | FAIL |
|
|
|
We do need the elevations of the house and addition and a cross section. The plan reviewer need to know how the addition is being connected to the house and the details of it. If you have any questions on the elevations or cross section call ###-#### and ask to speak with the residential plan reviewer.
|
Intake Approval | | | 5/22/2020 | | FAIL |
|
|
|
Prescreen Comments
1. Please provide ACCA approved load calculations for hvac (manual J)
2.Show compliance with the prescriptive energy requirements on plans or res-check
3.Show entire building height, and exterior materials in building elevations.
|
Application received | | | 5/21/2020 | | DONE |
|
|
|
Application submitted via PDS Online on May 21 2020 10:56AM
|