BLD-Final | 8/4/2020 | 8/5/2020 | 8/5/2020 | A | PART |
Dave Hannah
|
|
|
Nicole Phone #: ###-#### ok for tco needs fire to go perm and ada singage on rest room
|
FIRE-Final Inspection | 8/4/2020 | 8/5/2020 | 8/5/2020 | A | PART |
Jim Page
|
|
|
Previously noted items have been corrected, fire alarm modification to be completed under FIR20-00530 (addition of one notification devoce in changing room), fire sprinkler inspection complete, fire extingiusher is placed with a current inspection tag. 30 day TCO authorized for life fire safety, final signature contingent upon fire alarm modifications being completed and inspected.
Nicole Phone #: ###-####
|
BLD-Final | 8/3/2020 | 8/4/2020 | 8/4/2020 | P | NR |
Dave Hannah
|
|
|
Nicole Phone #: ###-#### needs to pass fire first
|
FIRE-Final Inspection | 8/3/2020 | 8/4/2020 | 8/4/2020 | A | FAIL |
Jim Page
|
|
|
Fire alarm notification required in changing room, a seperate permit is required for all fire alarm modifications. Provide annual inspection for fire extingiusher. Provide suite number for tenant space.
Nicole Phone #: ###-####
|
BLD-Framing/Rough-in | 7/10/2020 | 7/13/2020 | 7/13/2020 | A | PASS |
Jim Storey
|
|
|
*screened* Nickel Phone #: ###-####
|
FIRE-Conference | 7/7/2020 | 7/7/2020 | 7/7/2020 | P | DONE |
Troy Cobbley
|
|
|
Sprinkler protection will be required in the display windows on the back side of the new walls. Also the combustible concealed spaces will need to be addressed as discussed
SCREENED // Nicole Phone #: ###-####
|
Issue PAID IN FULL permit | | | 6/24/2020 | | DONE |
|
|
|
|
Print Occupancy Form | | | 6/24/2020 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 6/12/2020 | | DONE |
|
|
|
all met: NYoung@wbtbc.com
Need GC
Need Revised Values
|
Plan assigned to (JG) | 5/27/2020 | 5/27/2020 | 6/11/2020 | | PASS |
Javier Guzman
|
|
|
06/12 2nd rev L1 Baby Blues & Pink ePlan
|
Routing - PLAN CHECK | 6/8/2020 | | 6/11/2020 | | PASS |
Javier Guzman
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 6/11/2020 | | DONE |
|
|
|
|
Route to Impact Fee Review | 5/29/2020 | 6/1/2020 | 6/1/2020 | | PASS |
Shannon Cade
|
|
|
Review requested for Commercial Permit
|
Routing - PUBLIC WORKS | 5/27/2020 | | 5/29/2020 | | PASS |
Morgan Webb
|
|
|
|
1st review completed | | | 5/29/2020 | | FAIL |
Javier Guzman
|
|
|
|
Routing - PLAN CHECK | 5/27/2020 | | 5/28/2020 | | FAIL |
Javier Guzman
|
|
|
|
Routing - Addressing | 5/27/2020 | | 5/28/2020 | | PASS |
Doug Chausow
|
|
|
Suite 115
|
Intake Approval | | | 5/26/2020 | | PASS |
Javier Guzman
|
|
|
|
Intake Approval | | | 5/22/2020 | | FAIL |
Javier Guzman
|
|
|
For prescreen review provide and upload the following:
• Per ePlan submittal standards the reserve the bottom right corner on the drawing plans for City approval stamps. Leave a blank 4” x 4” space located 3” off the right sheet edge to allow for the title block on the cover sheet. see ePlan standards at https://www.cityofboise.org/media/7025/electronic_submittal_standards.pdf
• Per checklist if new lighting is being installed provide a Lighting Compliance COMcheck signed & printed on the plans.
|
Application received | | | 5/21/2020 | | DONE |
|
|
|
Application submitted via PDS Online on May 21 2020 6:27PM
|