Permit Information
Permit NumberBLD20-01693
StatusIssued
Name REED GENERAL CONSTRUCTION
Site Address 5220 N HICKORY GLEN PL
Project NameBeaufort Shop
Customer Number 
ePlanReviewYes
Description
Permit to build a 660sq' garage. All work per plans, notation, engineering, local codes & ordinances. Separate electrical permits required. **JAB**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Energy code compliance8/7/20208/11/20208/11/2020APASS
DetailsTell Riley
Scrrened- Kenvin Phone #: ###-####
BLD-Framing/Rough-in8/5/20208/6/20208/6/2020APASS
DetailsTell Riley
Kevin *screened* Phone #: ###-####//engineering letter provided for front truss frame wall--ok per engineering and letter//ok to insulate//
BLD-Wall Bracing7/28/20207/29/20207/29/2020APART
DetailsTell Riley
SCREENED ....... requested as early as possible shear // Kevin Phone #: ###-####//add hot dip galvanized to PT plate//add straps, provide engineers ok on hold downs and single bottom plate for engineered portal frame at garage door//all other shear nailing areas ok per plans//
BLD-Foundation7/8/20207/9/20207/9/2020APASS
DetailsMike Jordan
late morning-Kevin *screened* Phone #: ###-####
BLD-Footing7/7/20207/8/20207/8/2020APART
DetailsTell Riley
Kevin *screened* Phone #: ###-####//front pin on north side located, contractor pulled lengths to mark south pin on property, based on measurements and plans the new shop strucuture appears to be outside the 5' setback requirement at roughly 7 plus feet--front are rear setbacks ok//WIP//
Issue PAID IN FULL permit  6/24/2020 DONE
Inspection Record Card- Bld  6/24/2020 DONE
Telephone call  6/23/2020 DONE
emailed GC and homeowner to let them know permit cannot be issued without responsible person.
OVERRIDE  6/18/2020  
Plan assigned to (JAB) Josh5/27/20205/27/20206/18/2020 PASS
DetailsJosh Bogle
06/02 garage, ePlan - 1st done
Routing - PLAN CHECK6/18/2020 6/18/2020 PASS
DetailsJosh Bogle
PLANS/APPL TAKEN TO FRONT DESK  6/18/2020 DONE
DetailsJosh Bogle
ESC yes - Energy no
Permit Ready to Issue  6/18/2020 DONE
met: rich.beaufort@gmail.com

Need RP
Routing - PLAN CHECK6/16/2020 6/16/2020 FAIL
DetailsJosh Bogle
1st review completed  6/11/2020 FAIL
DetailsJosh Bogle
Routing - PLAN CHECK5/27/2020 6/11/2020 FAIL
DetailsJosh Bogle
see notes in ePlan
Routing - PLANNING5/27/2020 5/27/2020 PASS
DetailsSue Cummings
Plans ACCEPTED BY PLAN TECH  5/27/2020 DONE
Intake Approval  5/27/2020 PASS
Application received  5/22/2020 DONE
Application submitted via PDS Online on May 22 2020 1:18PM
Intake Approval  5/22/2020 FAIL
please upload plan sheets individually