BLD-Footing | 8/4/2020 | 8/5/2020 | 8/5/2020 | P | PART |
Tell Riley
|
|
|
lunchtime inspection for 1pm concrete pour Phone #: ###-#### Inspection requested via web by Jennifer Anderson//WIP//need to maintain 13' 4" setbacks from building--will be measured at final--north east most carport will need to be exact at final//footing depths ok when loose material is removed//per plans//
|
Issue PAID IN FULL permit | | | 8/3/2020 | | DONE |
|
|
|
|
Print Occupancy Form | | | 8/3/2020 | | DONE |
|
|
|
|
OVERRIDE | | | 7/10/2020 | | |
|
|
|
|
Plan assigned to (J_N) | 6/8/2020 | 6/8/2020 | 7/10/2020 | | DONE |
Jenny Nelson
|
|
|
07/10 - 502 Northview Apt Carports
|
Routing - PLAN CHECK | 6/8/2020 | | 7/10/2020 | | PASS |
Jenny Nelson
|
|
|
|
1st review completed | | | 7/10/2020 | | DONE |
Jenny Nelson
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 7/10/2020 | | DONE |
Jenny Nelson
|
|
|
|
Permit Ready to Issue | | | 7/10/2020 | | DONE |
|
|
|
MET Jeremy Amar
GC FORM
rp
|
Routing - FIRE | 6/8/2020 | 6/8/2020 | 7/7/2020 | | PASS |
Erika Akin
|
|
|
No comments attached. Carport installation on site plan does not adversely impact approved FD aerial access. Inspector to field verify unobstructed 26 foot width is maintained without encroachment.
|
Routing Off Site - STRUCTURAL | 6/8/2020 | | 6/30/2020 | | PASS |
|
|
|
AHJ
|
Routing - Erosion and Sediment | 6/8/2020 | | 6/19/2020 | | PASS |
Michael Zawacki
|
|
|
|
Routing - PLANNING | 6/8/2020 | | 6/19/2020 | | PASS |
Ethan Mansfield
|
|
|
|
Routing PW Grading-Hillside | 6/15/2020 | | 6/17/2020 | | CANC |
Jason C. Taylor
|
|
|
Not in Hillside, no review required. JCT
|
Routing PW Street Lights | 6/15/2020 | | 6/15/2020 | | PASS |
Tom Marshall
|
|
|
|
Routing PW Solid Waste | 6/15/2020 | | 6/15/2020 | | PASS |
Evan Carpenter
|
|
|
|
Routing PW Drainage | 6/15/2020 | | 6/15/2020 | | PASS |
Brian Murphy
|
|
|
CARPORTS
|
Routing - PUBLIC WORKS | 6/8/2020 | | 6/15/2020 | | PASS |
Morgan Webb
|
|
|
|
Routing - Design Review | 6/8/2020 | | 6/12/2020 | | PASS |
Katelyn Menuge
|
|
|
Redlined requirements on A1.1
|
Routing - Addressing | 6/8/2020 | | 6/8/2020 | | PASS |
Doug Chausow
|
|
|
|
Intake Approval | | | 6/1/2020 | | PASS |
Javier Guzman
|
|
|
|
Intake Approval | | | 5/27/2020 | | FAIL |
Javier Guzman
|
|
|
For prescreen review provide and upload the following:
• Provide a completed form 310 that is also stamped, signed and dated by an Idaho licensed engineer. Form 310 can be found at https://www.cityofboise.org/media/3760/final310_special_inspections.pdf
• Uploaded plan sheet A1.1 has a city approved stamp for a different permit and this project requires a site plan without the previous city stamp and the locations of the new carports shown on the site plan so that when project gets issued the new stamp will not overlay on top on previous stamp
|
Application received | | | 5/22/2020 | | DONE |
|
|
|
Application submitted via PDS Online on May 22 2020 1:22PM
|
FIRE-Final Inspection | 8/13/2020 | 8/14/2020 | | A | |
Jim Page
|
|
|
Screened- mat Phone #: ###-####
|