Information based on query as of Tuesday, July 23, 2024.
Permit Information
Permit NumberBLD20-01695
StatusFinaled
Name BLUE RAVEN SOLAR LLC
Site Address 5794 N FENWICK AVE
Project NameIsaak PV
Customer Number 
ePlanReviewYes
Description
Permit for 577.5 sq' of roof-mounted, grid-tied Photo-voltaic panels with micro-inverters; 33 panels in 2 arrays. No work needed to strengthen the existing roof structure per engineer’s roof evaluation. All racking, modules, and other listed equipment must be installed by a certified installer. All work per plans, engineering, manufacturer’s specs, & local code. Separate electrical permit required. **D_S**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final6/19/20206/22/20206/22/2020PPASS
DetailsTell Riley
Onsite contact: Mierins Rozentals Phone #: ###-#### Inspection requested via web by BRS Permitting//talked with Zoning-signature not required//appears to be installed per plans//
DOC - Permit Finaled6/22/20206/22/20206/22/2020PPASS
DetailsTell Riley
BLD-Framing/Rough-in6/16/20206/17/20206/17/2020ADEFR
DetailsTony Young
Taylor Barton is the onsite contact - ###-#### Phone #: ###-#### Inspection requested via web by BRS Permitting// no frame needed per scope of work
Issue PAID IN FULL permit  5/27/2020 DONE
Inspection Record Card- Bld  5/27/2020 DONE
Plan assigned to (D_S) Debbie5/22/20205/22/20205/26/2020 DONE
DetailsDebbie Sanine
5/28/20 PV ePlan
Permit Ready to Issue  5/26/2020 DONE
met
Application received  5/22/2020 DONE
Application submitted via PDS Online on May 22 2020 1:35PM
Plan assigned to (JAB) Josh5/22/20205/22/20205/22/2020 DEFR
DetailsJosh Bogle
Routing - PLAN CHECK5/22/2020 5/22/2020 PASS
DetailsJosh Bogle
ESC-N Energy-N
Routing - PLANNING5/22/2020 5/22/2020 PASS
DetailsCrystal Rain
1st review completed  5/22/2020 DONE
DetailsDebbie Sanine
PLANS/APPL TAKEN TO FRONT DESK  5/22/2020 DONE
DetailsDebbie Sanine
Plans ACCEPTED BY PLAN TECH  5/22/2020 DONE
Intake Approval  5/22/2020 PASS
Recd Pcfee & Taken To Pln CK  5/22/2020 DONE