BLD-Footing | 8/6/2020 | 8/7/2020 | 8/7/2020 | A | PASS |
Jim Storey
|
|
|
Ok with video/photo // Kevin Phone #: ###-####
|
Issue PAID IN FULL permit | | | 8/6/2020 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 8/6/2020 | | DONE |
|
|
|
|
Plan assigned to (JAB) Josh | 5/27/2020 | 5/27/2020 | 8/4/2020 | | PASS |
Josh Bogle
|
|
|
06/02 pergola, ePlan - 1st done
|
Routing - Design Review | 8/4/2020 | | 8/4/2020 | | PASS |
Katelyn Menuge
|
|
|
8/3/20 Site Plan is Approved
|
Plan Reviewer's activity | | | 8/4/2020 | | DONE |
Brian McGowan
|
|
|
Sending permit to be processed. Josh Passed Plan Check portion on 7/27
|
PLANS/APPL TAKEN TO FRONT DESK | | | 8/4/2020 | | DONE |
Brian McGowan
|
|
|
|
Plan Reviewer's activity | | | 8/4/2020 | | DONE |
Brian McGowan
|
|
|
ESC - No Energy - No
|
Permit Ready to Issue | | | 8/4/2020 | | DONE |
|
|
|
|
Plan Reviewer's activity | | | 8/3/2020 | | DONE |
Brian McGowan
|
|
|
Spoke with applicant, told them there was a resubmit task on the builders side. I would route the new Site Plan once it was resubmitted.
|
Routing - Design Review | 7/31/2020 | | 7/31/2020 | | FAIL |
Katelyn Menuge
|
|
|
New site plan still incorrect. Emailed applicant to explain issues. Appeal period ends 8/3 at 5pm
|
Routing - Design Review | 7/27/2020 | | 7/29/2020 | | FAIL |
Katelyn Menuge
|
|
|
Need updated site plan with accurate scale and building locations. DR appeal period ends 8-3-20 at 5pm.
|
Plan Reviewer's activity | | | 7/27/2020 | | DONE |
Josh Bogle
|
|
|
added missing DR routing
|
Routing - PLAN CHECK | 7/27/2020 | | 7/27/2020 | | PASS |
Josh Bogle
|
|
|
|
Plan Reviewer's activity | | | 7/27/2020 | | DONE |
Josh Bogle
|
|
|
accepted and routed resubmittal
|
Routing - PLAN CHECK | 5/27/2020 | | 6/11/2020 | | FAIL |
Josh Bogle
|
|
|
needs engineering
|
1st review completed | | | 6/11/2020 | | FAIL |
Josh Bogle
|
|
|
|
Routing - PLANNING | 5/27/2020 | | 5/27/2020 | | FAIL |
Sue Cummings
|
|
|
This is a substandard lot, which requires Design Review approval prior to obtaing building permits
|
Plans ACCEPTED BY PLAN TECH | | | 5/27/2020 | | DONE |
|
|
|
|
Intake Approval | | | 5/27/2020 | | PASS |
|
|
|
|
Application received | | | 5/26/2020 | | DONE |
|
|
|
Application submitted via PDS Online on May 26 2020 9:51AM
|
Intake Approval | | | 5/26/2020 | | FAIL |
|
|
|
Please provide a site full site plan showing location of home, Pergola and the distance from pergola to the property lines.
Please upload plans individually and rotate to the correct orientation
|
Routing - PLANNING | 7/27/2020 | | | | DONE |
Sue Cummings
|
|
|
Sent to Katelynn
|