BLD-Footing | 7/23/2020 | 7/23/2020 | 7/23/2020 | P | PASS |
Brandon Shaw
|
|
|
Work in progress...
|
Issue PAID IN FULL permit | | | 7/21/2020 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 7/21/2020 | | DONE |
|
|
|
|
Telephone call | | | 7/21/2020 | | DONE |
|
|
|
replied to GCs email letting them know we need the ESC permit signed as well.
|
OVERRIDE | | | 7/17/2020 | | |
|
|
|
|
Plan assigned to (BJM) | 6/15/2020 | 6/15/2020 | 7/17/2020 | | DONE |
Brian McGowan
|
|
|
07/14- 1st Review Complete- 06/02 addition, ePlan
|
Telephone call | | | 7/17/2020 | | DONE |
|
|
|
emailed GC fees due and let them know we need an RP
|
Routing - PLAN CHECK | 7/17/2020 | | 7/17/2020 | | PASS |
Brian McGowan
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 7/17/2020 | | DONE |
Brian McGowan
|
|
|
|
Permit Ready to Issue | | | 7/17/2020 | | DONE |
|
|
|
met
Need RP
|
Routing - MECHANICAL | 7/14/2020 | | 7/15/2020 | | PASS |
Troy James
|
|
|
Provided a Manual J for the addition he is proposing
|
Plan Reviewer's activity | | | 7/14/2020 | | DONE |
Brian McGowan
|
|
|
Received resubmittal (8) drawing sheets, calculations and Manual J for engineering and for mechanical.
|
Plan Reviewer's activity | | | 7/6/2020 | | DONE |
Josh Bogle
|
|
|
sent resubmittal to BJM
|
Plan Reviewer's activity | | | 6/29/2020 | | DONE |
Brian McGowan
|
|
|
Glen called to let me know he is waiting for engineering.
|
Plan Reviewer's activity | | | 6/16/2020 | | DONE |
Brian McGowan
|
|
|
Energy - YES ESC- YES
|
1st review completed | | | 6/16/2020 | | FAIL |
Brian McGowan
|
|
|
|
Routing - PLAN CHECK | 5/27/2020 | | 6/16/2020 | | FAIL |
Brian McGowan
|
|
|
|
Application received | | | 5/27/2020 | | DONE |
|
|
|
Application submitted via PDS Online on May 27 2020 12:21PM
|
Plan assigned to (JAB) Josh | 5/27/2020 | 5/27/2020 | 5/27/2020 | | DEFR |
Josh Bogle
|
|
|
06/02 addition, ePlan
|
Plans ACCEPTED BY PLAN TECH | | | 5/27/2020 | | DONE |
|
|
|
|
Intake Approval | | | 5/27/2020 | | PASS |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 5/27/2020 | | DONE |
|
|
|
|
Routing - PLANNING | 5/27/2020 | | 5/27/2020 | | PASS |
Jeff Lowe
|
|
|
|